Inspection Type | Scheduled | Assigned To | Completed Date | Result | Schedule Inspection | Inspection No. |
Bottom of Hole | 9/17/2021 | J.Sooter | 9/17/2021 11:41:17 AM | Approved | Completed | 683264 |
Bottom of Hole | 9/16/2021 | J.Sooter | 9/16/2021 1:57:41 PM | Cancel | Completed | 682872 |
Bottom of Hole | 9/15/2021 | J.Sooter | 9/16/2021 1:41:10 PM | Approved | Completed | 682531 |
Bottom of Hole | 9/15/2021 | J.Sooter | 9/15/2021 1:15:07 PM | Cancel | Completed | 682707 |
Bottom of Hole | 9/14/2021 | J.Sooter | 9/14/2021 12:28:01 PM | Cancel | Completed | 671622 |
Bottom of Hole | 9/14/2021 | J.Sooter | 9/14/2021 12:27:38 PM | Cancel | Completed | 675832 |
Bottom of Hole | | J.Sooter | 9/13/2021 2:36:46 PM | Approved | Completed | 671621 |
Bottom of Hole | 8/6/2021 | J.Sooter | 8/9/2021 8:05:15 AM | Cancel | Completed | 671623 |
Ceiling / Act | | | | | Schedule Inspection | 695038 |
Concrete Encased Electrode | | | | | Schedule Inspection | 695061 |
Final Fire Inspection | | | | | Schedule Inspection | 695056 |
Final Structural | | | | | Schedule Inspection | 823164 |
Final Structural | | | | | Schedule Inspection | 695040 |
Final Structural | 9/12/2024 | P.Calhoun | 9/12/2024 7:25:22 AM | Cancel | Completed | 823153 |
Final Zoning | | | | | Schedule Inspection | 695041 |
Fire Rated Wall(s) | 11/22/2024 | P.Calhoun | 11/22/2024 2:19:01 PM | Approved | Completed | 833878 |
Fire Rated Wall(s) | 11/18/2024 | P.Calhoun | 11/18/2024 1:21:04 PM | Approved | Completed | 833008 |
Fire Rated Wall(s) | 11/14/2024 | P.Calhoun | 11/14/2024 9:34:46 AM | NA | Completed | 832435 |
Fire Rated Wall(s) | 11/13/2024 | P.Calhoun | 11/13/2024 2:59:09 PM | Cancel | Completed | 832223 |
Fire Rated Wall(s) | 11/12/2024 | P.Calhoun | 11/12/2024 9:32:01 AM | Correction | Completed | 832128 |
Fire Rated Wall(s) | 10/23/2024 | B.Gilgus | 10/23/2024 2:09:09 PM | Approved | Completed | 829850 |
Fire Rated Wall(s) | 10/22/2024 | B.Gilgus | 10/22/2024 1:54:03 PM | Approved | Completed | 829392 |
Fire Rated Wall(s) | 10/21/2024 | P.Calhoun | 10/21/2024 2:05:31 PM | Correction | Completed | 829259 |
Fire Rated Wall(s) | 10/4/2024 | P.Calhoun | 10/4/2024 2:00:01 PM | Approved | Completed | 826641 |
Fire Rated Wall(s) | 10/2/2024 | P.Calhoun | 10/2/2024 2:09:42 PM | Correction | Completed | 826320 |
Fire Rated Wall(s) | 10/1/2024 | P.Calhoun | 10/1/2024 9:57:53 AM | Cancel | Completed | 825655 |
Fire Rated Wall(s) | 9/27/2024 | P.Calhoun | 9/27/2024 1:30:51 PM | Cancel | Completed | 695039 |
Fire Rated Wall(s) | 9/26/2024 | P.Calhoun | 9/26/2024 3:01:11 PM | Cancel | Completed | 825438 |
FireStopping | | | | | Schedule Inspection | 695060 |
Footing | 9/26/2024 | P.Calhoun | 9/26/2024 1:50:37 PM | Approved | Completed | 825434 |
Footing | 9/9/2024 | P.Calhoun | 9/9/2024 9:14:49 AM | Approved | Completed | 726876 |
Footing | 8/10/2022 | B.Gilgus | 8/10/2022 2:03:12 PM | Approved | Completed | 727297 |
Footing | 8/5/2022 | B.Gilgus | 8/5/2022 1:43:12 PM | Cancel | Completed | 726721 |
Footing | 6/8/2022 | J.Sooter | 6/8/2022 2:10:15 PM | Approved | Completed | 717748 |
Footing | 5/20/2022 | J.Sooter | 5/20/2022 3:20:41 PM | Approved | Completed | 714838 |
Footing | 5/19/2022 | J.Sooter | 5/19/2022 1:40:54 PM | Correction | Completed | 695042 |
Foundation | 10/24/2024 | B.Gilgus | 10/24/2024 8:42:51 AM | Approved | Completed | 779010 |
Foundation | 10/17/2023 | J.Sooter | 10/17/2023 3:13:49 PM | Approved | Completed | 781493 |
Foundation | 9/27/2023 | P.Calhoun | 9/27/2023 8:59:12 AM | Correction | Completed | 778992 |
Foundation | 7/7/2022 | P.Calhoun | 7/7/2022 3:14:01 PM | Approved | Completed | 721612 |
Foundation | 6/29/2022 | J.Bergstrom | 6/29/2022 12:55:58 PM | Approved | Completed | 720691 |
Foundation | 6/24/2022 | P.Calhoun | 6/24/2022 12:04:40 PM | Approved | Completed | 720201 |
Foundation | 6/10/2022 | J.Sooter | 6/10/2022 1:18:34 PM | Approved | Completed | 718203 |
Foundation | 6/1/2022 | J.Sooter | 6/1/2022 3:11:46 PM | Approved | Completed | 695043 |
Framing | 5/3/2024 | P.Calhoun | 5/3/2024 12:46:11 PM | Approved | Completed | 803002 |
Framing | 4/25/2024 | B.Gilgus | 4/25/2024 1:25:03 PM | Approved | Completed | 801749 |
Framing | 4/22/2024 | P.Calhoun | 4/22/2024 12:12:38 PM | Approved | Completed | 800099 |
Framing | 4/15/2024 | P.Calhoun | 4/15/2024 12:57:42 PM | Cancel | Completed | 800014 |
Framing | 4/9/2024 | P.Calhoun | 4/9/2024 1:38:22 PM | Approved | Completed | 720199 |
Framing | 6/24/2022 | P.Calhoun | 6/24/2022 8:45:58 AM | Cancel | Completed | 695044 |
Framing / Ext. | 10/4/2024 | P.Calhoun | 10/4/2024 1:55:46 PM | Approved | Completed | 818929 |
Framing / Ext. | 8/15/2024 | P.Calhoun | 8/15/2024 1:35:07 PM | Correction | Completed | 816594 |
Framing / Ext. | 8/1/2024 | P.Calhoun | 8/1/2024 1:50:55 PM | Cancel | Completed | 814976 |
Framing / Ext. | 7/23/2024 | P.Calhoun | 7/23/2024 1:05:14 PM | Cancel | Completed | 814555 |
Framing / Ext. | 7/19/2024 | P.Calhoun | 7/19/2024 8:51:18 AM | Cancel | Completed | 814539 |
Framing / Ext. | 7/8/2024 | P.Calhoun | 7/8/2024 2:57:23 PM | Approved | Completed | 812624 |
Framing / Ext. | 6/14/2024 | P.Calhoun | 6/14/2024 3:15:29 PM | Approved | Completed | 809246 |
Framing / Ext. | 6/10/2024 | P.Calhoun | 6/10/2024 2:47:00 PM | Approved | Completed | 807842 |
Framing / Ext. | 6/5/2024 | P.Calhoun | 6/5/2024 1:38:42 PM | Correction | Completed | 807521 |
Framing / Ext. | 6/3/2024 | P.Calhoun | 6/3/2024 9:28:57 AM | Approved | Completed | 805326 |
Framing / Ext. | 5/20/2024 | P.Calhoun | 5/20/2024 12:26:17 PM | Correction | Completed | 805079 |
Framing / Ext. | 5/17/2024 | P.Calhoun | 5/17/2024 12:20:01 PM | Cancel | Completed | 804691 |
Framing / Ext. | 5/15/2024 | P.Calhoun | 5/15/2024 2:46:45 PM | Cancel | Completed | 803829 |
Framing / Ext. | 5/9/2024 | P.Calhoun | 5/9/2024 2:33:02 PM | Cancel | Completed | 803723 |
Framing / Ext. | 5/7/2024 | P.Calhoun | 5/7/2024 2:08:51 PM | Approved | Completed | 803312 |
Framing / Ext. | 5/6/2024 | P.Calhoun | 5/6/2024 1:29:21 PM | Cancel | Completed | 802967 |
Framing / Ext. | 5/2/2024 | P.Calhoun | 5/2/2024 2:34:47 PM | Cancel | Completed | 802477 |
Framing / Ext. | 4/30/2024 | P.Calhoun | 4/30/2024 1:20:37 PM | Cancel | Completed | 802273 |
Framing / Ext. | 4/29/2024 | P.Calhoun | 4/29/2024 2:36:56 PM | Cancel | Completed | 802093 |
Framing / Int. | 11/19/2024 | P.Calhoun | 11/20/2024 7:01:40 AM | Approved | Completed | 833227 |
Framing / Int. | 11/18/2024 | P.Calhoun | 11/18/2024 1:16:55 PM | Approved | Completed | 832974 |
Framing / Int. | 11/15/2024 | P.Calhoun | 11/15/2024 2:54:18 PM | Approved | Completed | 831146 |
Framing / Int. | 11/1/2024 | B.Gilgus | 11/1/2024 11:05:13 AM | Cancel | Completed | 831086 |
Framing / Int. | 10/1/2024 | P.Calhoun | 10/1/2024 10:32:35 AM | Approved | Completed | 826209 |
Framing / Int. | 9/30/2024 | P.Calhoun | 9/30/2024 12:46:20 PM | Approved | Completed | 825926 |
Framing / Int. | 9/30/2024 | P.Calhoun | 9/30/2024 12:40:09 PM | Approved | Completed | 825760 |
Framing / Int. | 9/26/2024 | P.Calhoun | 9/26/2024 2:28:04 PM | Approved | Completed | 825436 |
Framing / Int. | 9/26/2024 | P.Calhoun | 9/26/2024 1:52:02 PM | Approved | Completed | 825435 |
Framing / Int. | 9/25/2024 | P.Calhoun | 9/25/2024 8:58:27 AM | Approved | Completed | 825031 |
Framing / Int. | 9/24/2024 | P.Calhoun | 9/24/2024 10:55:16 AM | Approved | Completed | 824895 |
Framing / Int. | 9/23/2024 | P.Calhoun | 9/23/2024 2:44:14 PM | Approved | Completed | 824478 |
Framing / Int. | 9/20/2024 | P.Calhoun | 9/20/2024 3:14:07 PM | Approved | Completed | 824552 |
Framing / Int. | 9/19/2024 | P.Calhoun | 9/19/2024 1:49:11 PM | Correction | Completed | 824338 |
Framing / Int. | 9/12/2024 | P.Calhoun | 9/12/2024 11:39:53 AM | Approved | Completed | 823162 |
Glazing / Storefront | 10/9/2024 | P.Calhoun | 10/9/2024 2:09:21 PM | Approved | Completed | 695045 |
Insulation / Vapor Barrier | | | | | Schedule Inspection | 825866 |
Insulation / Vapor Barrier | 9/27/2024 | P.Calhoun | 9/27/2024 1:31:17 PM | Cancel | Completed | 825644 |
Insulation / Vapor Barrier | 9/26/2024 | P.Calhoun | 9/26/2024 2:19:00 PM | Correction | Completed | 825437 |
Insulation / Vapor Barrier | 8/12/2024 | P.Calhoun | 8/12/2024 12:55:43 PM | Approved | Completed | 816566 |
Insulation / Vapor Barrier | 8/3/2024 | B.Gilgus | 8/3/2024 11:39:01 AM | Approved | Completed | 816798 |
Insulation / Vapor Barrier | 8/1/2024 | P.Calhoun | 8/1/2024 1:00:00 PM | Cancel | Completed | 816398 |
Insulation / Vapor Barrier | 7/26/2024 | P.Calhoun | 7/26/2024 1:00:29 PM | Approved | Completed | 815593 |
Insulation / Vapor Barrier | 7/22/2024 | P.Calhoun | 7/24/2024 9:25:46 AM | Approved | Completed | 814708 |
Insulation / Vapor Barrier | 7/24/2024 | P.Calhoun | 7/24/2024 9:24:15 AM | Approved | Completed | 814977 |
Insulation / Vapor Barrier | 7/23/2024 | P.Calhoun | 7/23/2024 1:06:33 PM | Cancel | Completed | 814871 |
Insulation / Vapor Barrier | 7/12/2024 | P.Calhoun | 7/12/2024 11:44:37 AM | Approved | Completed | 813188 |
Insulation / Vapor Barrier | 7/10/2024 | P.Calhoun | 7/10/2024 2:56:41 PM | Correction | Completed | 812958 |
Insulation / Vapor Barrier | 7/9/2024 | P.Calhoun | 7/9/2024 2:35:09 PM | Cancel | Completed | 812783 |
Insulation / Vapor Barrier | 7/3/2024 | P.Calhoun | 7/5/2024 7:32:05 AM | Approved | Completed | 811485 |
Insulation / Vapor Barrier | 6/27/2024 | P.Calhoun | 6/27/2024 1:25:01 PM | Cancel | Completed | 811358 |
Insulation / Vapor Barrier | 6/26/2024 | B.Gilgus | 6/26/2024 10:46:47 AM | Approved | Completed | 810268 |
Insulation / Vapor Barrier | 6/20/2024 | B.Gilgus | 6/20/2024 2:00:08 PM | Cancel | Completed | 809527 |
Insulation / Vapor Barrier | 6/14/2024 | P.Calhoun | 6/14/2024 3:16:16 PM | Cancel | Completed | 809247 |
Insulation / Vapor Barrier | 6/11/2024 | P.Calhoun | 6/11/2024 8:56:40 AM | Approved | Completed | 808606 |
Insulation / Vapor Barrier | 5/20/2024 | P.Calhoun | 5/20/2024 12:23:34 PM | Approved | Completed | 805213 |
Insulation / Vapor Barrier | 5/14/2024 | P.Calhoun | 5/15/2024 7:18:56 AM | Approved | Completed | 804236 |
Insulation / Vapor Barrier | 5/13/2024 | P.Calhoun | 5/13/2024 1:36:49 PM | Correction | Completed | 803828 |
Insulation / Vapor Barrier | 5/9/2024 | P.Calhoun | 5/9/2024 2:32:31 PM | Cancel | Completed | 803721 |
Insulation / Vapor Barrier | 5/3/2024 | P.Calhoun | 5/3/2024 12:43:51 PM | Approved | Completed | 803001 |
Insulation / Vapor Barrier | 4/30/2024 | P.Calhoun | 4/30/2024 2:40:38 PM | Approved | Completed | 801323 |
Insulation / Vapor Barrier | 4/29/2024 | P.Calhoun | 4/29/2024 1:07:59 PM | Approved | Completed | 801100 |
Insulation / Vapor Barrier | 4/23/2024 | P.Calhoun | 4/23/2024 2:57:21 PM | Cancel | Completed | 801174 |
Insulation / Vapor Barrier | 4/22/2024 | P.Calhoun | 4/23/2024 12:35:11 PM | Approved | Completed | 800988 |
Insulation / Vapor Barrier | 4/22/2024 | P.Calhoun | 4/22/2024 12:17:45 PM | Correction | Completed | 800989 |
Insulation / Vapor Barrier | 4/19/2024 | P.Calhoun | 4/19/2024 9:15:35 AM | Approved | Completed | 800804 |
Insulation / Vapor Barrier | 4/9/2024 | P.Calhoun | 4/9/2024 1:44:05 PM | Approved | Completed | 799371 |
Other Structural | 11/23/2024 | P.Calhoun | | | Reschedule Inspection | 833789 |
Other Structural | | | | | Schedule Inspection | 833782 |
Other Structural | 9/24/2024 | P.Calhoun | 9/24/2024 9:15:54 AM | Approved | Completed | 824841 |
Other Structural | 9/23/2024 | P.Calhoun | 9/23/2024 1:32:43 PM | Cancel | Completed | 824724 |
Other Structural | 9/20/2024 | P.Calhoun | 9/20/2024 2:06:36 PM | Approved | Completed | 824553 |
Other Structural | 9/18/2024 | P.Calhoun | 9/18/2024 3:03:46 PM | Approved | Completed | 823911 |
Other Structural | 4/30/2024 | P.Calhoun | 4/30/2024 2:39:45 PM | Approved | Completed | 802272 |
Other Structural | 4/29/2024 | P.Calhoun | 4/29/2024 2:36:37 PM | Cancel | Completed | 801750 |
Other Structural | 4/25/2024 | B.Gilgus | 4/25/2024 12:43:37 PM | Cancel | Completed | 796205 |
Other Structural | 3/14/2024 | P.Calhoun | 3/14/2024 12:51:11 PM | Approved | Completed | 796152 |
Other Structural | 3/14/2024 | P.Calhoun | 3/14/2024 12:45:32 PM | Cancel | Completed | 796153 |
Other Structural | 3/8/2024 | P.Calhoun | 3/8/2024 9:23:30 AM | Approved | Completed | 795508 |
Other Structural | 2/29/2024 | P.Calhoun | 2/29/2024 2:18:11 PM | NA | Completed | 789663 |
Other Structural | 1/25/2024 | P.Calhoun | 1/25/2024 2:25:14 PM | Approved | Completed | 790776 |
Other Structural | 1/10/2024 | P.Calhoun | 1/10/2024 1:41:23 PM | Approved | Completed | 789691 |
Other Structural | 1/9/2024 | P.Calhoun | 1/9/2024 1:48:41 PM | Correction | Completed | 789592 |
Other Structural | 11/21/2023 | P.Calhoun | 11/21/2023 10:25:11 AM | Approved | Completed | 785334 |
Other Structural | 11/8/2023 | P.Calhoun | 11/8/2023 8:49:30 AM | Cancel | Completed | 720387 |
Other Structural | 10/6/2023 | J.Bergstrom | 10/6/2023 2:37:38 PM | Approved | Completed | 780349 |
Other Structural | 6/23/2022 | J.Sooter | 6/27/2022 8:16:23 AM | Cancel | Completed | 719892 |
Other Structural | 6/22/2022 | J.Sooter | 6/22/2022 2:28:19 PM | Cancel | Completed | 719214 |
Other Structural | 6/17/2022 | B.Gilgus | 6/17/2022 2:40:01 PM | Partial | Completed | 718202 |
Other Structural | 6/10/2022 | J.Sooter | 6/10/2022 1:16:48 PM | Cancel | Completed | 717751 |
Other Structural | 6/8/2022 | J.Sooter | 6/8/2022 2:05:31 PM | Cancel | Completed | 717433 |
Other Structural | 6/7/2022 | J.Sooter | 6/7/2022 12:47:15 PM | Cancel | Completed | 695046 |
Pre Zoning | | | | | Schedule Inspection | 695047 |
Pre-Construction Meeting | 8/9/2023 | J.Sooter | 8/9/2023 12:11:38 PM | Approved | Completed | 771875 |
Private Development Site Civil | | M.Guzik | | | Schedule Inspection | 695055 |
Retro Anchors / Bolts | | | | | Schedule Inspection | 695048 |
Roof Nailing | 7/1/2024 | P.Calhoun | 7/1/2024 3:19:57 PM | Approved | Completed | 811776 |
Roof Nailing | 4/15/2024 | P.Calhoun | 4/15/2024 12:58:27 PM | Approved | Completed | 799889 |
Roof Nailing | 4/12/2024 | P.Calhoun | 4/12/2024 1:24:32 PM | Cancel | Completed | 799453 |
Roof Nailing | 4/9/2024 | P.Calhoun | 4/9/2024 1:31:28 PM | Cancel | Completed | 695049 |
Roof Nailing | 3/30/2024 | B.Peterson | 3/30/2024 1:15:00 AM | Approved | Completed | 798378 |
Shaftwall | | | | | Schedule Inspection | 695050 |
Shearwall / Exterior | 7/19/2024 | P.Calhoun | 7/19/2024 8:54:00 AM | Approved | Completed | 814448 |
Shearwall / Exterior | 7/18/2024 | P.Calhoun | 7/18/2024 2:17:19 PM | Cancel | Completed | 814323 |
Shearwall / Exterior | 7/16/2024 | P.Calhoun | 7/16/2024 2:34:16 PM | Approved | Completed | 813837 |
Shearwall / Exterior | 7/8/2024 | P.Calhoun | 7/8/2024 2:27:54 PM | Approved | Completed | 812623 |
Shearwall / Exterior | 7/1/2024 | P.Calhoun | 7/1/2024 12:04:38 PM | Approved | Completed | 811523 |
Shearwall / Exterior | 6/27/2024 | P.Calhoun | 6/27/2024 2:46:36 PM | Correction | Completed | 811359 |
Shearwall / Exterior | 6/21/2024 | B.Gilgus | 6/21/2024 8:54:06 AM | Approved | Completed | 810267 |
Shearwall / Exterior | 6/20/2024 | B.Gilgus | 6/20/2024 1:59:27 PM | Cancel | Completed | 803830 |
Shearwall / Exterior | 5/9/2024 | P.Calhoun | 5/9/2024 2:33:21 PM | Cancel | Completed | 803724 |
Shearwall / Exterior | 4/22/2024 | P.Calhoun | 4/22/2024 12:15:03 PM | Approved | Completed | 800925 |
Shearwall / Exterior | 4/19/2024 | P.Calhoun | 4/19/2024 3:13:00 PM | Correction | Completed | 800747 |
Shearwall / Exterior | 4/18/2024 | P.Calhoun | 4/18/2024 2:35:59 PM | Cancel | Completed | 800548 |
Shearwall / Exterior | 4/16/2024 | P.Calhoun | 4/16/2024 1:49:44 PM | Approved | Completed | 800204 |
Shearwall / Exterior | 4/15/2024 | P.Calhoun | 4/15/2024 1:17:45 PM | Approved | Completed | 799890 |
Shearwall / Exterior | 4/12/2024 | P.Calhoun | 4/12/2024 1:25:31 PM | Cancel | Completed | 799731 |
Shearwall / Exterior | 4/11/2024 | P.Calhoun | 4/11/2024 1:18:48 PM | Correction | Completed | 799454 |
Shearwall / Exterior | 4/9/2024 | P.Calhoun | 4/9/2024 1:32:12 PM | Cancel | Completed | 799153 |
Shearwall / Exterior | 4/5/2024 | B.Gilgus | 4/5/2024 1:40:04 PM | Partial | Completed | 695051 |
Shearwall / Interior | 11/2/2024 | B.Gilgus | 11/2/2024 1:20:02 PM | Approved | Completed | 831003 |
Shearwall / Interior | 11/1/2024 | B.Gilgus | 11/1/2024 11:06:29 AM | Approved | Completed | 830836 |
Shearwall / Interior | 10/30/2024 | B.Gilgus | 10/30/2024 1:44:02 PM | Cancel | Completed | 830577 |
Shearwall / Interior | 10/29/2024 | B.Gilgus | 10/29/2024 12:14:38 PM | Approved | Completed | 830526 |
Shearwall / Interior | 10/15/2024 | P.Calhoun | 10/15/2024 2:57:48 PM | Correction | Completed | 827402 |
Shearwall / Interior | 10/9/2024 | P.Calhoun | 10/9/2024 2:12:17 PM | Approved | Completed | 827553 |
Shearwall / Interior | 10/8/2024 | P.Calhoun | 10/8/2024 12:14:34 PM | Correction | Completed | 827223 |
Shearwall / Interior | 10/7/2024 | P.Calhoun | 10/7/2024 2:33:51 PM | Cancel | Completed | 827096 |
Shearwall / Interior | 10/4/2024 | P.Calhoun | 10/4/2024 2:01:20 PM | Approved | Completed | 826910 |
Shearwall / Interior | 10/2/2024 | P.Calhoun | 10/3/2024 1:01:46 PM | Approved | Completed | 826208 |
Shearwall / Interior | 9/3/2024 | P.Calhoun | 9/3/2024 12:56:04 PM | Approved | Completed | 821068 |
Shearwall / Interior | 8/30/2024 | P.Calhoun | 8/30/2024 2:50:04 PM | Approved | Completed | 821065 |
Shearwall / Interior | 8/28/2024 | P.Calhoun | 8/28/2024 2:47:34 PM | Approved | Completed | 820443 |
Shearwall / Interior | 8/26/2024 | P.Calhoun | 8/26/2024 2:54:23 PM | Cancel | Completed | 820078 |
Shearwall / Interior | 8/22/2024 | P.Calhoun | 8/22/2024 2:44:37 PM | Cancel | Completed | 819924 |
Shearwall / Interior | 8/21/2024 | B.Gilgus | 8/21/2024 1:05:42 PM | Approved | Completed | 819659 |
Shearwall / Interior | 8/20/2024 | B.Gilgus | 8/20/2024 1:53:56 PM | Cancel | Completed | 819449 |
Shearwall / Interior | 8/19/2024 | B.Gilgus | 8/19/2024 12:59:43 PM | Cancel | Completed | 819319 |
Shearwall / Interior | 8/15/2024 | P.Calhoun | 8/15/2024 1:32:47 PM | Approved | Completed | 805328 |
Shearwall / Interior | 5/20/2024 | P.Calhoun | 5/20/2024 12:30:23 PM | Correction | Completed | 805080 |
Shearwall / Interior | 5/17/2024 | P.Calhoun | 5/17/2024 12:20:42 PM | Cancel | Completed | 804077 |
Shearwall / Interior | 5/10/2024 | D.Hickel | 5/10/2024 3:35:39 PM | Correction | Completed | 803827 |
Shearwall / Interior | 5/9/2024 | P.Calhoun | 5/9/2024 2:32:00 PM | Cancel | Completed | 803525 |
Shearwall / Interior | 5/7/2024 | P.Calhoun | 5/7/2024 1:54:21 PM | Correction | Completed | 695052 |
Slab on Grade | 7/18/2024 | P.Calhoun | 7/18/2024 9:44:22 AM | Approved | Completed | 813835 |
Slab on Grade | 7/16/2024 | P.Calhoun | 7/16/2024 3:22:31 PM | Approved | Completed | 812955 |
Slab on Grade | 7/12/2024 | P.Calhoun | 7/12/2024 3:00:49 PM | Approved | Completed | 731153 |
Slab on Grade | 7/10/2024 | P.Calhoun | 7/10/2024 2:56:00 PM | Correction | Completed | 695053 |
Slab on Grade | 7/9/2024 | P.Calhoun | 7/9/2024 2:33:33 PM | Cancel | Completed | 812781 |
Slab on Grade | 9/13/2022 | B.Gilgus | 9/13/2022 2:23:54 PM | Approved | Completed | 732268 |
Slab on Grade | 9/9/2022 | B.Gilgus | 9/9/2022 3:07:22 PM | Approved | Completed | 731872 |
Slab on Grade | 9/7/2022 | B.Gilgus | 9/7/2022 12:25:19 PM | Approved | Completed | 731464 |
Slab on Grade | 9/6/2022 | J.Bergstrom | 9/6/2022 12:26:00 PM | Approved | Completed | 731259 |
Slab on Grade | 9/2/2022 | P.Calhoun | 9/2/2022 9:48:41 AM | Cancel | Completed | 731110 |
Steel Bolting / Welding | 10/23/2024 | B.Gilgus | 10/23/2024 2:07:53 PM | Approved | Completed | 829840 |
Steel Bolting / Welding | 10/10/2024 | P.Calhoun | 10/10/2024 1:53:10 PM | Approved | Completed | 827556 |
Steel Bolting / Welding | 8/15/2024 | P.Calhoun | 8/16/2024 9:02:19 AM | Approved | Completed | 812960 |
Steel Bolting / Welding | 7/9/2024 | P.Calhoun | 7/9/2024 2:35:36 PM | Cancel | Completed | 812789 |
Steel Bolting / Welding | 7/8/2024 | P.Calhoun | 7/8/2024 2:34:04 PM | Approved | Completed | 809608 |
Steel Bolting / Welding | 6/14/2024 | P.Calhoun | 6/17/2024 9:54:14 AM | Correction | Completed | 809248 |
Steel Bolting / Welding | 10/18/2023 | J.Sooter | 10/18/2023 9:29:57 AM | Approved | Completed | 695054 |
StormWater Inspection-Monthy | 11/8/2024 | C.Weed | | | View Scheduled Inspection | 828010 |
StormWater Inspection-Monthy | 10/8/2024 | C.Weed | 10/7/2024 8:18:00 AM | Progress | Completed | 823539 |
StormWater Inspection-Monthy | 9/6/2024 | C.Weed | 9/9/2024 2:26:00 PM | Progress | Completed | 818032 |
StormWater Inspection-Monthy | 8/1/2024 | C.Weed | 8/6/2024 8:37:00 AM | Progress | Completed | 813256 |
StormWater Inspection-Monthy | 6/3/2024 | C.Weed | 7/3/2024 8:15:00 AM | Progress | Completed | 803212 |
StormWater Inspection-Monthy | 11/15/2023 | C.Weed | 5/2/2024 9:03:00 AM | Progress | Completed | 783037 |
StormWater Inspection-Monthy | 10/16/2023 | C.Weed | 10/24/2023 9:47:00 AM | Progress | Completed | 779012 |
StormWater Inspection-Monthy | 9/25/2023 | C.Weed | 9/26/2023 8:58:00 AM | Progress | Completed | 775341 |
StormWater Inspection-Monthy | 8/18/2023 | C.Weed | 8/29/2023 8:51:00 AM | Progress | Completed | 770127 |
StormWater Inspection-Monthy | 7/20/2023 | C.Weed | 7/25/2023 8:54:00 AM | Progress | Completed | 765934 |
StormWater Inspection-Monthy | 6/8/2023 | C.Weed | 6/22/2023 8:42:00 AM | Progress | Completed | 758297 |
StormWater Inspection-Monthy | 11/28/2022 | C.Weed | 5/2/2023 8:33:00 AM | Progress | Completed | 739683 |
StormWater Inspection-Monthy | 10/19/2022 | C.Weed | 10/26/2022 8:25:00 AM | Progress | Completed | 734184 |
StormWater Inspection-Monthy | 9/21/2022 | C.Weed | 9/19/2022 8:24:00 AM | Progress | Completed | 730281 |
StormWater Inspection-Monthy | 8/19/2022 | C.Weed | 8/24/2022 8:37:00 AM | Progress | Completed | 724230 |
StormWater Inspection-Monthy | 7/21/2022 | C.Weed | 7/20/2022 8:45:00 AM | Progress | Completed | 719551 |
StormWater Inspection-Monthy | 6/20/2022 | C.Weed | 6/20/2022 8:52:00 AM | Progress | Completed | 715908 |
StormWater Inspection-Monthy | 5/23/2022 | C.Weed | 5/24/2022 7:55:00 AM | Progress | Completed | 712437 |
StormWater Inspection-Monthy | 4/25/2022 | C.Weed | 5/2/2022 8:06:00 AM | Progress | Completed | 699578 |
StormWater Inspection-Monthy | | | 1/13/2022 10:57:00 AM | Progress | Completed | 695059 |
StormWater Inspection-Monthy | 12/15/2021 | C.Weed | 12/14/2021 4:31:00 PM | Progress | Completed | 693205 |
StormWater Inspection-Monthy | 11/15/2021 | C.Weed | 11/17/2021 4:11:00 PM | Progress | Completed | 688932 |
StormWater Inspection-Monthy | 10/14/2021 | C.Weed | 10/18/2021 11:10:00 AM | Progress | Completed | 682654 |
StormWater Inspection-Monthy | | C.Weed | 9/13/2021 4:34:00 PM | Progress | Completed | 669122 |
Temp Electric | 5/24/2023 | E.Widman | 5/24/2023 2:50:36 PM | Approved | Completed | 757688 |
Temp Electric | 5/2/2023 | E.Widman | 5/2/2023 2:55:40 PM | Correction | Completed | 695057 |
Temp Gas | | | | | Schedule Inspection | 695058 |