Permit Number: C21-1153
Permit Type: Commercial Building Permit - None BldgNew
Address: W 160 48TH AVE Anchorage
Location: 160 W 48th Ave
Work Description: EPLANS-117094 SQFT, TYPE VB, OCCUPANCY R-1-GJS
NO CCO ON THIS PERMIT UNTIL SHARED ACCESS WITH C15-1806 IS RESOLVED. JCA 6/19/23 Resolved with change order X22-1625. JCA 8/13/24

**REVOKED MAIN PERMIT AND ISSUED CORE AND SHELL ONLY PER JUDY 6/19/23 - SEE HER COMMENTS UNDER PD CIVIL REVIEW - BWP**
Change order X22-1625 has been approved and this permit (C21-1153) has full PD Civil approval.  - RDO (Per PDCivil Final Review)
***PHIL CALHOUN OKAYED A SATURDAY INSPECTION FOR 8/3/24 FOR INSUL/VAPOR BARRIER; PAID $800 FOR SATURDAY INSPECTION*** CCK 8/2/24
***JESSE SOOTER OKAYED SATURDAY INSPECTION FOR 11/23/24 FOR SHEETROCK SCREW PATTERN FOR 4TH FLOOR- CCK 11/22/24
Status: Issued
Project Name: EPLANS- CANDLEWOOD SUITES/HOLIDAY INN EXPRESS
Review Type: Structural
Result: FandF
Result Date: 10/18/2021 3:13:00 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

STRUCTURAL REVIEW COMMENTS

Project Name: C21-1153
Project Description: EPLANS- CANDLEWOOD SUITES/HOLIDAY INN EXPRESS

Review Comments List Date: 10/18/2021

Ref. # 160, 8/17/21 3:50 PM, Cycle 3, Unresolved

Markup: Struc 38, S3.0B.pdf

It is not clear how the roof framing members are supported at the corner overhang; please provide framing connections or hangers.

Reviewer Response: 10/18/21 2:48 PM
The plans do not appear to be revised. Please show the calculations for the diagonal LVL beam members; these beams appear to have a cantilever distance beyond the outer support that is approximately twice the back span. No uplift connector appears to be specified for this diagonal beam. The Simpson MIT hangers specified are not skewable; please specify hangers compatible with the angle of the roof framing members.
Responded by: Kayli Thompson - 10/7/21 2:35 PM
SEE REVISED PLANS, REVISE CALCS & STRUCTURAL RESPONSE LETTER

Ref. # 164, 8/17/21 4:04 PM, Cycle 3, Unresolved

Markup: Struc 41, S8.1.pdf

Please provide a connection to brace the wall for out-of-plane forces.

Reviewer Response: 10/18/21 3:04 PM
Please confirm that the blocking detail for out-of-plane forces shown in Detail 2/S6.1 also applies for stair landing framing.
Responded by: Kayli Thompson - 10/7/21 2:35 PM
SEE REVISED PLANS, REVISE CALCS & STRUCTURAL RESPONSE LETTER
Reviewer Response: 9/30/21 2:32 PM
Please provide members, straps or connectors to transfer the out-of-plane wind and seismic wall forces into the diaphragm at all parallel joist conditions as required by AWC SDPWS 4.2.1. Blocking and connections are not currently shown.

Ref. # 199, 9/30/21 2:40 PM, Cycle 5, Unresolved

Comment: Please reload all structural drawings in ePlans with clean, un-editable PDF files. The drawings currently contain text attributes that are incompatible with the ePlans system.

Responded by: Kayli Thompson - 10/7/21 2:35 PM
SEE REVISED PLANS, REVISE CALCS & STRUCTURAL RESPONSE LETTER