Click Here To View Another Inspection Inspection #: 803827 Inspection Type: Shearwall / Interior Inspector: D.Hickel Result: Correction Comment: Two full height studs required at 3rd to 4th floor corridor shear walls at floor to floor strapped connections. Boundary members of shear walls (studs) are to be full height. Trimmers and headers, to be considered as part of the boundary member, require engineered design and connections. Design and calculations to be submitted as a change order. Inspection Corrections DateStatusCodeDescriptionRefLocationComments 5/7/2024TransferINTSWCSee Inspector commentsInspector comments Hold downs shall be connected to full height boundary members.