Click Here To View Another Inspection Inspection #: 778992 Inspection Type: Foundation Inspector: P.Calhoun Result: Correction Comment: 9am inspection preferably. 11am pour time. Rebar inspection on plinth @ gridline O/25.2. plinth corner chipped off during anchor bolt placement, removed top 6" of concrete, Top hoop is all that is being inspected, passed special inspection on 9/26/23 (ATL). Requested by: Sloane Tuttle 9079177244 st@akncs.com Inspection Corrections DateStatusCodeDescriptionRefLocationComments 9/27/2023TransferFOUNTSee Inspe ctor commentsInspector comments Rebar hoops shall wrap around all verts.