Date | Status | Code | Description | Ref | Location | Comments |
2/18/2025 | Transfer | INTFRAMEC | See Inspector comments | Inspector comments | | not ready |
1/28/2025 | Corrected | INTFRAMEC | See Inspector comments | Inspector comments | | Provide SI report for hold downs and anchor bolt locations. Firestop penetrations through plates. |