Register
My Neighborhood
Jobs
Contact Us
Home
Residents
Businesses
Government
Visitors
Departments
Public Safety
Transportation
Recreation
ePay
Maps
Services A-Z
Muni.org
>
Departments
>
Development Services
> Permit Information & Inspection Request
Click Here To Go Back To Permit Information
Permit Number:
C21-1153
Permit Type:
Commercial Building Permit - None BldgNew
Address:
W 160 48TH AVE Anchorage
Location:
160 W 48th Ave
Work Description:
EPLANS-117094 SQFT, TYPE VB, OCCUPANCY R-1-GJS
NO CCO ON THIS PERMIT UNTIL SHARED ACCESS WITH C15-1806 IS RESOLVED. JCA 6/19/23
Resolved with change order X22-1625. JCA 8/13/24
**REVOKED MAIN PERMIT AND ISSUED CORE AND SHELL ONLY PER JUDY 6/19/23 - SEE HER COMMENTS UNDER PD CIVIL REVIEW - BWP**
Change order X22-1625 has been approved and this permit (C21-1153) has full PD Civil approval. - RDO (Per PDCivil Final Review)
***PHIL CALHOUN OKAYED A SATURDAY INSPECTION FOR 8/3/24 FOR INSUL/VAPOR BARRIER; PAID $800 FOR SATURDAY INSPECTION*** CCK 8/2/24
***JESSE SOOTER OKAYED SATURDAY INSPECTION FOR 11/23/24 FOR SHEETROCK SCREW PATTERN FOR 4TH FLOOR- CCK 11/22/24
Status:
Issued
Project Name:
EPLANS- CANDLEWOOD SUITES/HOLIDAY INN EXPRESS
Review Type:
Mechanical
Result:
Correction
Result Date:
8/13/2021 11:11:57 AM
Comments:
Code Section
Review Comment
Status
Advisory Information:
144
3
Mechanical
Leigh Bergstrom
8/12/21 2:50 PM
Changemark
MECH-1
GENERAL NOTES AND SPECIFICATIONS, ITEM #6. THERE IS NO CRAWLSPACE FOR THIS PROJECT. PLEASE DELETE THE REFERENCE.
M1.0.pdf
Unresolved
145
3
Mechanical
Leigh Bergstrom
8/12/21 2:55 PM
Changemark
MECH-1
PLEASE CLARIFY THE MINIMUM OUTSIDE AIR SETTING REQUIRED FOR AHU-101 & 102 PER IMC 403.
M1.1.pdf
Unresolved
146
3
Mechanical
Leigh Bergstrom
8/12/21 2:57 PM
Changemark
MECH-1
PLEASE CLARIFY THE PTAC HEATING CAPACITY. IS THIS INPUT OR OUTPUT?
M1.2.pdf
Unresolved
147
3
Mechanical
Leigh Bergstrom
8/12/21 3:04 PM
Changemark
MECH-1
FOR SHEETS M3.0 AND M3.1, PLEASE IDENTIFY EACH GAS RISER FOR THE PTAC UNITS AS TO TYPE 1, 2, 3 OR 4 AS SHOWN ON M3.5.
M3.0.pdf
Unresolved
148
3
Mechanical
Leigh Bergstrom
8/12/21 3:06 PM
Changemark
MECH-1
GENERAL NOTES 1 THRU 4 ALL PERTAIN TO DUCTS AND HAS NOTHING TO DO WITH THIS PAGE. PLEASE DELETE.
M2.8.pdf
Unresolved
149
3
Mechanical
Leigh Bergstrom
8/12/21 3:10 PM
Changemark
MECH-1
FOR SHEETS M3.2, M3.3 AND M3.4 PLEASE CLARIFY THE SHEET NOTES AND GENERAL NOTES.
M3.2.pdf
Unresolved
150
3
Mechanical
Leigh Bergstrom
8/12/21 3:21 PM
Changemark
MECH-1
THIS SHEET HAS NOT BEEN LABELED WITH AN M-SHEET NUMBER. THE DETAILS WOULD REFERENCE IT AS M3.6; HOWEVER THE SHEET WAS LOADED INTO E-PLANS AS SHEET M4.0. FURTHER COMPLICATING THINGS IS THAT SHEET M4.0 FIRST FLOOR AREA "A" VENTING IS MISSING FROM THE PLAN SET.
M4.0.pdf
Unresolved
151
3
Mechanical
Leigh Bergstrom
8/12/21 3:25 PM
Changemark
MECH-2
PLEASE UPDATE ALL OF THE REFERENCED EQUIPMENT IN THE GENERAL NOTES WITH THE SPECIFIC REFERENCE/TAG NUMBERS.
M4.0.pdf
Unresolved
152
3
Mechanical
Leigh Bergstrom
8/12/21 3:27 PM
Changemark
MECH-3
PLEASE PROVIDE THE CORRECT TAG REFERENCE NUMBERS FOR THE HEAT EXCHANGERS IN THE POOL HEATING PIPING SCHEMATIC.
M4.0.pdf
Unresolved
153
3
Mechanical
Leigh Bergstrom
8/12/21 4:38 PM
Changemark
MECH-1
FOR SHEETS M4.0? AND M4.1 THRU M4.4, ALL OF THE TWO BURNER COOKTOPS REQUIRE A HOOD WITH VENTING TO THE OUTDOORS PER IMC 505.3 AND 505.6. PLEASE ADDRESS.
M4.1.pdf
Unresolved
154
3
Mechanical
Leigh Bergstrom
8/12/21 4:38 PM
Changemark
MECH-2
WITH REFERENCE TO M4.0 THRU M4.4, WHEN THE SUPPLY MAIN IS LOCATED ABOVE THE RATED CORRIDOR AND A DROP COMES OFF TO SUPPLY THE HALLWAY, A FIRE DAMPER IS REQUIRED AND THE OTHER DROPS PENETRATING CORRIDOR WALLS NEED ONLY TO BE FIRE CAULKED.. TO ACCOMPLISH THE COORIDOR SUPPLY DAMPER INSTALLATION, RUN THE BRANCH DUCT INTO AN ADJACENT ROOM, LOOP IT AROUND BACK INTO THE CORRIDOR AND APPLY THE FIRE DAMPER AT THE SECOND WALL PENETRATION.
M4.1.pdf
Unresolved
155
3
Mechanical
Leigh Bergstrom
8/12/21 4:50 PM
Changemark
MECH-1
PROVIDE A NOTE IN LARGE BOLD LETTERS FOR THE CONTRACTOR TO "PROVIDE STRUCTURAL SEISMIC AND WIND LOAD CALCULATIONS PLUS FASTENING DETAILS FOR AC-101 THRU AC-106, HRV-101 THRU 301, HRU-103, AHU-101 & 102, DHV-101, AS-101, BLR-101 & 102, WH-101 & 102 HWST-101 THRU 106 AND ET-101 TO INCLUDE THE ENGINEER'S STAMP AND SIGNATURE, FOR STRUCTURAL REVIEW ON A DEFERRED SUBMITTAL BASIS."
M4.8.pdf
Unresolved
157
3
Mechanical
Leigh Bergstrom
8/13/21 9:45 AM
Changemark
MECH-1
WE ARE NOT AWARE OF ANY LISTED FIRE DAMPERS FOR DUCT PENETRATIONS OF RATED FLOOR/CEILING ASSEMBLIES IN WOOD FRAME CONSTRUCTION. AS A RESULT ANY SUCH PENETRATIONS MUST BE WITHIN RATED SHAFTS WITH SHAFT PENETRATIONS PROVIDED WITH FIRE/SMOKE DAMPERS. PLEASE INCLUDE THE REQUIRED FIRE/SMOKE DAMPERS AND SHAFT LOCATIONS IN THIS SCHEMATIC DIAGRAM. (IMC 607.5.5)
M4.8.pdf
ADA Compliance
Privacy Statement & Disclaimer
Employee Search
eNewsletter
RSS
OFFICIAL WEB SITE OF THE MUNICIPALITY OF ANCHORAGE, ALASKA
632 West 6th Avenue, Anchorage, Alaska 99501