Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: C17-1344
Permit Type: Commercial Building Permit - None BldgCombo
Address: 1700 HILLCREST DR Anchorage
Location:
Work Description: RENOVATION OF AN ADDITION TO IMC WING.  RECONFIGURATION OF WHS ADMIN AREA.  THIS APPLICATION IS FOR DEMOLITION, HAZMAT, FOOTINGS, FOUNDATIONS, SITE WORK PERMIT AND EARLY STRUCTRUAL REVIEW AS AGREE ON WITH THE MOA DURING MEETING 3/8/17.  COMPLETED PLANS TO BE SUBMITTED FOR COMPLETE BUILDING PERMIT IN MAY.  FULL PAYMENT FOR THE COMPLETED BUILDING PERMIT IS BEING MADE AT THIS TIME TO SIMPLIFY THE APPLICATION AND REVIEW PROCESS. AE
Status: Closed
Project Name: WEST HIGH- ROMIG MS IMC WING RENOVATION
Review Type: Mechanical
Result: Approved
Result Date: 6/14/2017 8:45:00 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:



Reviewed by: Bergstrom, Leigh W.

Phone: 343-8326

Fax: 249-7615

Email: BergstromLW@muni.org

Permit Manager: Andrew Earp

Phone: 343-8338

Email: Earpal@muni.org

Project: WEST HS-ROMIG MS IMC WING

Review Number: 391220


1) STATUS: 4-25-2017 Provide 100% mechanical plans. Comments to be addressed.            6-14-2017 COMMENTS TO BE ADDRESSED.                         6-22-2017 APPROVED.


2) The following comments based upon the 2012 International Building, Mechanical and Fuel Gas Codes must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC, IMC, IFGC or any federal, state or local regulations.                      RESOLVED 6-22-2017.


3) Provide structural, seismic and wind load calculations, as applicable, plus fastening details for B-1 & 2, AHU-1 & 2, RF-1, 2 & 3, VF-1 and AS-1 & 2 to include the engineers stamp and signature, for structural review on a deferred submittal basis.                 RESOLVED 6-22-2017.


4) M003                 Clarify the minimum outside air setting required for AHU-1 & 2 required per IMC 403.              RESOLVED PER RE-SUBMITTAL RECEIVED VIA E-MAIL 6-15-2017.


5) M003                 Smoke detectors are required for AHU-1 & 2 per IMC 606.2. Please clarify.               RESOLVED PER RE-SUBMITTAL RECEIVED VIA E-MAIL 6-15-2017.


6) When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised mechanical pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT.   (23.10.104.8.1)               RESOLVED 6-22-2017.

ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS