78,062 sq ft (4) story mixed occupancy hotel OK TO ISSUE GRADING/EXCAVATION WITHOUT FEES PAID PER GRETCHEN 9/1/2017 PLAN REVIEW FEES PAID IN FULL, X17-1099 PAID IN FULL 6/6/18 ***10/9/18 OKAY FOR GENERAL TO P/U FOR JM MECH... SLO
***OK FOR F&F AND CORE/SHELL ONLY! - CHANGE ORDER REQUIRED FOR UPDATED CIVIL PLANS TO INLCUDE SHARED ACCESS (REF PERMIT #C21-1153) PRIOR TO ISSUING FULL PERMIT - RDO / G.SOULE 03/18/24***
*** ORIGINAL FEES WERE PAID BY CHECK WRITTEN BY PROPERTY OWNERS (ANCHORAGE MC HOLDING LLC). WRITTEN LETTER BY OWNER REQUIRED FOR EACH CONTRACTOR TRASNFER (ALL DISCIPLINES AS NECESSARY) - RED 6/26/24
MOA & MC HOLDING LLC AGREEMENT OF REINSPECTION FEES DUE (169 INSPECTIONS @$175/EA LOADED IN INFOR 7/2/24) TO PROCEED WITH PROJECT (EMAIL ATTACHED FOR RECORDS ALONG WITH TRANSFER OF CONTRACTORS TO JANSEN AS GENERAL AND SAMSON FOR ELECTRICAL)- RED 7/2/24
FULL PERMIT ISSUED - 9/3/24 - RED
Advisory Comment: Right of Way Permit required for all work in Municipal Rights of Way, Public Use, generic Utility, Storm Drainage, and some BLM Easements. Types of work include, but are not limited to water and sewer service connections, new driveways, drainage improvements and landscaping improvements. Only contractors with a current Right of Way Bond on file in the Right of Way Office may obtain a Right of Way Permit.
Provide or correct the Vicinity or Location Plan.
Provide common access agreement for proposed Tract A & Tract B. Missing, Second request via phone to Jeff Palmer of Lounsbury. Jeff will provide asap. RRJ
Provide civil details such as a pavement cut replacement detail, curb cut details as required, or refer in the general notes to comply with MASS details.
Correct all easement names to that of the plat(s) of record or recorded documents.
Show soil borings, the results, water levels, soil types and classifications.
Depict on all appropriate sheets the existing and proposed construction.