78,062 sq ft (4) story mixed occupancy hotel OK TO ISSUE GRADING/EXCAVATION WITHOUT FEES PAID PER GRETCHEN 9/1/2017 PLAN REVIEW FEES PAID IN FULL, X17-1099 PAID IN FULL 6/6/18 ***10/9/18 OKAY FOR GENERAL TO P/U FOR JM MECH... SLO
***OK FOR F&F AND CORE/SHELL ONLY! - CHANGE ORDER REQUIRED FOR UPDATED CIVIL PLANS TO INLCUDE SHARED ACCESS (REF PERMIT #C21-1153) PRIOR TO ISSUING FULL PERMIT - RDO / G.SOULE 03/18/24***
*** ORIGINAL FEES WERE PAID BY CHECK WRITTEN BY PROPERTY OWNERS (ANCHORAGE MC HOLDING LLC). WRITTEN LETTER BY OWNER REQUIRED FOR EACH CONTRACTOR TRASNFER (ALL DISCIPLINES AS NECESSARY) - RED 6/26/24
MOA & MC HOLDING LLC AGREEMENT OF REINSPECTION FEES DUE (169 INSPECTIONS @$175/EA LOADED IN INFOR 7/2/24) TO PROCEED WITH PROJECT (EMAIL ATTACHED FOR RECORDS ALONG WITH TRANSFER OF CONTRACTORS TO JANSEN AS GENERAL AND SAMSON FOR ELECTRICAL)- RED 7/2/24
FULL PERMIT ISSUED - 9/3/24 - RED
Reviewed by: Bergstrom, Leigh W. Permit #: C15-1806
Phone: 343-8326 Date: 2/24/2016
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Tony Barganier
Phone: 343-8339
Email: BarganierTA@muni.org
Project: COURTYARD BY MARRIOTT
Review Number: 366898
1) STATUS: 9-01-15 Comments to be addressed. 2-24-2016 COMMENTS TO BE ADDRESSED.
2) The following comments based upon the 2009 Uniform Plumbing Code must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Plumbing Code or any federal, state or local regulations. RESOLVED 2-24-2016.
3) P0.1 Clarify Note #11 at the gas meter. RESOLVED PER RE-SUBMITTAL RECEIVED 2-05-2016.
4) P1.1 Note #20 refers to detail 1/P3.0 which is actually on sheet P3.1. RESOLVED PER RE-SUBMITTAL RECEIVED 2-05-2016.
5) P1.1 Note #21 refers to detail 2/P3.0 which is actually 15/P4.0. RESOLVED PER RE-SUBMITTAL RECEIVED 2-05-2016.
6) Provide a kitchen and bar area food service equipment schedule that includes required utility connection sizes and loads. 2-24-2016 UNRESOLVED. THIS INFORMATION IS REQUIRED IN ORDER TO COMPLETE THE PLUMBING REVIEW.
7) P1.1 & P2.1 Provide enlarged kitchen and bar area plumbing plans. RESOLVED PER RE-SUBMITTAL RECEIVED 2-05-2016.
8) P2.1 The 3/4" HWC tag at the NW corner of the pool is tagged to a NG line. RESOLVED PER RE-SUBMITTAL RECEIVED 2-05-2016.
9) P2.1 Clarify the location of the control panel for SP-1 & SP-2. RESOLVED PER RE-SUBMITTAL RECEIVED 2-05-2016.
10) 3/P3.1 A double check valve would be sufficient backflow protection for the domestic water service and the sprinkler system. RESOLVED PER RE-SUBMITTAL RECEIVED 2-05-2016.
11) 7/P4.0 "At all points where fuel gas piping enters or leaves the ground, there shall be installed, above ground, an approved or listed fuel gas piping connector, capable of absorbing a six-inch displacement, in any direction, due to frost heave action." (Local amendment to IFGC 404.17) An additional flex connector is required at the fire pit. RESOLVED PER RE-SUBMITTAL RECEIVED 2-05-2016.
12) 15/P4.0 The elevator sump is required to be at least 24" x 24" x 24" per MOA Policy L.02. RESOLVED PER RE-SUBMITTAL RECEIVED 2-05-2016.
13) 7/M4.0 The 4" gas main (6,242 MBH @ 350'), (3,795 MBH @ 350') and the 1-1/2" main serving the griddle, range and fryer (432 MBH @ 204') appear to be undersized per UPC Table 12-8. RESOLVED PER RE-SUBMITTAL RECEIVED 2-05-2016.
14) 2-24-2016 New P0.1 Clarify the two gas branches on the incoming gas service to the building?
15) 2-24-2016 New P0.1 Clarify the freeze protection required on the exterior grease waste line and GI-1. (UPC 313.6)
16) 2-24-2016 New P1.1 All vertical rain leaders are
required to have a cleanout prior to dropping below grade and connecting to the horizontal drains. (UPC 1101.12.2)
17) 2-24-2016 New 2/P2.5 The bar area floor sinks are connected to the grease waste system. Please clarify.
18) 2-24-2016 New 3/P2.5 The 3/4" CW servicing HB-2 at the trash enclosure (Ref note #15) requires backflow protection. Since this is a high risk application, a simple vacuum breaker will not suffice. (UPC 603 and The AWWA Cross-Connection Control Manual)
19) 2-24-2016 New 3/P2.5 The civil drawings indicate an 8" incoming water service connection to the building (not 4"). Please clarify.
20) When the above comments have been addressed please update the plans at the MOA Plans Review Office with three sets of revised plumbing pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT.