| 12/22/2025 | Transfer | Correct Below | * | | Remaining rooftop corrections. | 1. Two, 50A AC units do not appear to have listing labels.
2. AC unit where roof penetration with LB violates 110.26 clearances: label to indicate reduced working clearances.
3. Disconnect labelling to include disconnect load and circuit source. |
| 12/22/2025 | Transfer | Correct Below | * | | All Mech / Electric Room electrical panels. | Will need to verify available fault current and series ratings / labelling if required. |
| 12/22/2025 | Transfer | Correct Below | * | | 2nd floor Mech / Electrical Room HRU 201. | 1. Working clearance issues - wrap metal piping, etc. with non-conductive material.
2. Requires platform to provide flat standing space. |
| 12/22/2025 | Transfer | Correct Below | * | | 1st floor exterior access Mech Room. | 1. (2) GFCIs not resetting.
2. At least (1) circuit not complete.
3. Unable to determine EM lights circuit. |
| 12/22/2025 | Transfer | Correct Below | * | | 1st floor Boiler / Electrical Room. | Panels H1 and H1A contain 10K rated breakers. Available fault current? Series Rating? |
| 12/22/2025 | Transfer | Correct Below | * | | 1st floor Boiler / Electrical Room. | Boilers OCPD reduced to 20A. |
| 12/22/2025 | Transfer | Correct Below | * | | AHU 102 in 1st floor Boiler / Electrical Room. | 1. Non-conductive wrap on metal piping in working clearances. 2. Label to warn of reduced working clearances. |
| 12/22/2025 | Transfer | Correct Below | * | | AHU in small mech room behind Housekeeping. | Label shows MOP as 20.3A. |
| 12/22/2025 | Transfer | Correct Below | * | | Various AHUs. | Factory cord-like wiring method inside air handling spaces - working with ETL to determine conformance to listing standard. |