| Date | Status | Code | Description | Ref | Location | Comments |
| 3/21/2025 | Transfer | firesprinklr14 | Correction(s) #1 | <div>Correct the following item(s):</div><div><br></div> | | 3rd floor commercial sprinkler protection. (1) Multiple sprinkler heads are painted. (2) Sprinkler heads in slatted ceiling are void of the listing as they do not have a listed escutcheon ring installed for semi recessed installation (3) Conference room needs sprinkler head installed in breakfast bar area (4) Beer tap area needs sprinkler head installed - area has closet doors to enclose (5) Need to look at all heads that they are parallel to ceiling (6) This is not a complete list. |
| 3/21/2025 | Transfer | firesprinkl15 | Correction(s) #2 | <div>Correct the following item(s):</div><div><br></div> | | 2nd floor commercial sprinkler protection. (1) Multiple sprinkler heads are painted in the bar area. (2) sprinkler heads in slatted ceiling are void of the listing as they do not have a listed escutcheon ring installed for semi recessed installation. (3) Private dinning room has addition heads added that differ from the approved plans (4) Front commercial hood sprinkler heads are to close to the make up air vents are obstructing the sprinkler spray pattern. Not put in per plan. (5) Entrance to kitchen missing head. (6) dish washing area sprinkler heads are obstructed do to racking. Reconfigure head to have 1 head in center of area. (7) Back kitchen hood, left sprinkler head in front of hood is 8+ feet from the face of the hood and is over spaced. (8) This is not a complete list. |