Click Here To View Another Inspection Inspection #: 196126 Inspection Type: Private Development Site Civil Inspector: P.Ronning Result: Progress Comment: 8-3-12 GMC placing CPEP with end sections at eastern retention poond. Backfilling, watering and compacting material removed to place pipe. Finishing Edge has placed curb and gutter in the parking lot on the south side of the site. Time 1.0 hr Inspection Corrections DateStatusCodeDescriptionRefLocationComments