Click Here To View Another Inspection Inspection #: 191858 Inspection Type: Private Development Site Civil Inspector: P.Ronning Result: Progress Comment: 7-11-12 Contractor has graded retention area running east/west at center of site. Pipe extending into retention area not clear could find the north end but not south end. Contractor screening material and exporting larger rocks. Storm drain structures stockpiled on site, however no pipe was stockpled. Time 1.0 hr. Inspection Corrections DateStatusCodeDescriptionRefLocationComments