569 Sq Ft Addition and T/I to incude plumb/mech/electric - BWP
Where special inspections or testing is required by IBC section 1704, 1707 or 1708, the registered design professional in responsible charge shall prepare a statement of special inspections in accordance with IBC section 1705 for submittal by the applicant. Please provide a statement of special inspections.
Any system or method of construction to be used shall be based on a rational analysis in accordance with well-established principles of mechanics. Such analysis shall result in a system that provides a complete load path capable of transferring loads from their point of origin to the load-resisting elements.
Refer to Sheets S3.3, S3.4. Please provide design calculations for the following:a. HSS vertical lift lateral restraint framing (re: Details 4/ thru 6/S3.3).b. Rooftop and hood framing and connections to structure (re: Details 2/ and 5/S3.4).Note: These items may be deferred per AMC 23.10.104.9.11/5/15 - Resolved. Design calculations provided. MMP