Permit Number: C13-1360
Permit Type: Commercial Building Permit - None BldgCombo
Address: W 330 DIMOND BLVD Anchorage
Location:
Work Description:

3474 sq ft tire sales addition; parking revisions & minor landscaping changes / tb

**DO NOT ISSUE CO UNTIL PERMIT FOR ADA BATHROOM HAS BEEN SUBMITTED PER R. NOFFSINGER**

PERMIT FOR ADA BATHROOMS C14-1564 / TB

Status: Closed
Project Name: COSTCO
Review Type: Architectural
Result: Correction
Result Date: 5/12/2013 4:34:04 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

 

Reviewed by: Crafts, Donald E.                                                  Permit #: C13-1360

Phone: 343-8451                                                                        Date: 05/10/13

Fax: 249-7652

Email: CraftsDE@muni.org

Permit Manager: Tony Barganier

Phone: 343-8339

Email: BarganierT@muni.org

Project: COSTCO - 330 W DIMOND BLVD

Review Number: 312615

 

1.  Status: Architectural Corrections required.  05/10/13

 

2.  The following comments based on the 2009 International Building Code (IBC) and 2009 International Existing Building Code (IEBC) must be resolved before a permit is issued.  The plans and specifications do not permit the violation of any section of the IBC or any federal, state, or local regulations.

 

3.  Drawing Drawing SD101, Project Data; The plan Project Data includes a mini code study for an addition to the building.  Please expand the code study to include Building Construction Type, Allowable Area, Sprinklers, Fire Alarms, Accessibility, Combustible Storage per IBC Section 413, etc.  05/10/13

 

4.  Drawing SD101, Project Data and Drawing A504, Tire Center Plan; The plan indicates an addition to the building.  The plan does not indicate a plumbing fixture count (required/provided) to show compliance with the requirement per IBC Table 2902.1.   Please provide a new section indicating fixture count (required/provided) based on this addition.  05/10/13

 

5.  Drawing A601, Door Schedule; The plan indicates door hardware group selected; however, the the hardware group specifications are not provided.  Please provide door hardware specifications.  05/10/13

 

6.  Drawing A601, Door Schedule and Drawing A504, Floor Plan; The plan indicates two new exterior door pairs (Doors 55A & 55B and 56A & 56B); however, it does not indicate whether the doors are specified as being insulated.  Please verify that these new doors are insulated.  05/10/13

 

7.  Drawing A702, Section at Tire Installation; All Wall, Ceiling and Roof Assembly Sections,   Although insulation is shown in some of these locations, the insulation R values are not identified on the Drawing Plan Set as submitted.  Please provide assurance that the New Addition Building Envelope meets or exceeds the Energy Efficiency requirements of IBC Section 1301.1 and The International Energy Conservation Code (IECC) Chapter 5 and Local Amendments to IECC Chapter 5 requirements.  Show compliance with the requirements of Climate Zone 7 in IECC Table 502.2(1) and 502.2(3) as well as the Local Amendment to IECC Table 502.2(1) on unheated slabs.  Include the insulation R values for exterior doors and windows.   05/10/13