Date | Status | Code | Description | Ref | Location | Comments |
4/2/2024 | | PlumbFinal | Comments | See Inspector Comments | | 1070 valve and hammer arrester required in both gang baths per plans available |
4/2/2024 | | PlumbFinal | Comments | See Inspector Comments | | STAMPED Plans required to be on site at time of inspection |