| Date | Status | Code | Description | Ref | Location | Comments |
| 6/15/2021 | Corrected | MechFinal16 | Deferred Submittals | Deferred submittals are required for rooftop equipment- AMC23.10.104.8.12 | RTU | MOA approved deferred submittals required showing engineered form of attachment related to all equipment weighing over 400#s. |
| 6/15/2021 | Corrected | MechFinal | See comments | See Inspector Comments | RTU | Condensate trap required. |
| 6/15/2021 | Corrected | MechFinal12 | Hood and Makeup Air | Hood and mechanical make-up air systems shall be automatically controlled to start and operate simultaneously with the exhaust system- IMC 508.1 | Grease hood/make up air | Functional interlock required. |
| 6/15/2021 | Corrected | MechFinal14 | Type I Exhaust Fan Drain |
<p>Vertical upblast type I hood exhaust fan shall have an approved drain outlet and grease reservoir IMC 506.5.2</p>
| Grease duct exhaust fan | Grease drain catch required. |