Click Here To View Another Inspection Inspection #: 534183 Inspection Type: Other Structural Inspector: J.Sooter Result: Partial Comment: Progress inspection. Contractor providing additional uplift connections at stud/plate, mechanical connection at beam at entry, additional ventilation at full hieght blocking. Call in framing inspection after electrical and plumbing rough in is completed. Inspection Corrections DateStatusCodeDescriptionRefLocationComments