| Date | Status | Code | Description | Ref | Location | Comments |
| 7/9/2014 | Transfer | EF1 | Correct Below | | 277V-120V control transformer. | Ground one leg. Use ground bar. |
| 7/9/2014 | Transfer | EF1 | Correct Below | | Dist pnl H10. | Breaker feeding pnl H9 is shown on dwgs as 100A, not 70A as installed. |
| 7/9/2014 | Transfer | EF1 | Correct Below | | | |
| 7/9/2014 | Transfer | EF1 | Correct Below | | Freezer condensate heat trace. | Needs GFPE. |
| 7/9/2014 | Transfer | EF1 | Correct Below | | Sales floor. | Several large ceiling paddle fans not shown on dwgs. Who did this work? |
| 7/9/2014 | Transfer | EF1 | Correct Below | | Canopy electrical work: airdoors and CRVs | Shown on dwgs: Who did this work? Not Marshall's Electric. |
| 7/9/2014 | Transfer | EF1 | Correct Below | | Change order | Complete, show new pnl feeding entry ckts |
| 7/9/2014 | Transfer | EF1 | Correct Below | | Entry pnl feeding htrs, air curtains. | Make breaker designations specific. |
| 7/9/2014 | Transfer | EF1 | Correct Below | | Rooftop AC3 | WR recept. In use cover. |
| 7/9/2014 | Transfer | EF1 | Correct Below | | Administrative. | Speak to chief of building inspections about underground covered without inspection. |
| 12/2/2013 | Transfer | EF1 | Correct Below | | Approved dwgs | Do not show or include in load calc, (12) HBH circuits. |
| 12/2/2013 | Transfer | EF1 | Correct Below | | Light switches | Need barrier between ckts with 480V between. |
| 12/2/2013 | Transfer | EF1 | Correct Below | | High emergency light in center. | Not coming on. |