IN ORDER TO RECEIVE A CERTIFICATE OF COMPLETION OR OCCUPANCY, THE APPLICANT SHALL SUBMIT A SIGNED AND NOTARIZED OPERATIONS & MAINTENANCE AGREEMENT AND CIVIL AS-BUILTS AND SCHEDULE A FINAL PD CIVIL INSPECTION.
Footings and foundation walls to grade are approved. The ground floor interior slab is not approved. The interior floor is pending submittals from Civil and Mechanical Engineers.
ATTENTION: The following discharges to the Municipal Separate Storm Sewer Systems (MS4) (stormwater conveyance such as but not limited to, storm drains, pipes, ditches, etc.) is prohibited unless otherwise authorized in writing by the ADEC.
* Sewage.
*Discharges of wash water resulting from the hosing or cleaning of gas stations, auto repair garages, or other types of automotive services facilities.
*Discharges resulting from the cleaning, repair, or maintenance of any type of equipment, machinery, or facility, including motor vehicles, cement-related equipment, and port-a-potty servicing, etc.
*Discharges of wash water from mobile operations, such as mobile automobile or truck washing, steam cleaning, power washing, and carpet cleaning, etc.
*Discharges of wash water from the cleaning or hosing of impervious surfaces in municipal, industrial, commercial, and residential areas – including parking lots, streets, sidewalks, driveways, patios, plazas, work yards and outdoor eating or drinking areas, etc. – where no detergents are used and no spills or leaks or toxic or hazardous materials have occurred (unless all spilled material has been removed).
*Discharges of runoff from material storage areas containing chemicals, fuels, grease, oil or other hazardous material.
*Discharges of pool or fountain water containing chlorine, biocides, or other chemicals; discharges of pool or fountain filter backwash water.
*Discharges of sediment, pet waste, vegetation clippings, or other landscape or construction-related waste; and
*Discharges of food-related waste (grease, fish processing, and restaurant kitchen mat and trash bin wash water, etc.).
To receive a certificate of completion (or occupancy), the applicant shall submit a signed, notarized, and recorded Operations & Maintenance Plan and Civil As-builts and schedule a final PD Civil inspection. The O&M Plan and Civil As-builts can be emailed to Steve at (steven.ellis@anchorageak.gov) or Paul at (paul.j.lafrance@anchorageak.gov ).
See Eplans for comments.