THE ELECTRICAL PLANS ARE REVIEWED AND APPROVED
----------------------------------------------------------
REQUIREMENT OF ELECTRICAL WORK: Please provide the electrical scope of work and include existing service load calculations, panel schedules with connected and demand loads, one-line diagram and accessibility to overcurrent protection so we can determine if work requires 100% designed engineered electrical drawing.