Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: C24-1989
Permit Type: Commercial Building Permit - None BldgAlter
Address: W 239 4TH AVE Anchorage
Location:
Work Description: REMOVE EXISTING BUILT-UP ROOF SYSTEM AND REPLACE WITH NEW SINGLE-PLY ROOF ST=YSTEM ON A 3090 SQ FT SECTION OF THE AVIATOR HOTEL - MM
****RICH OKAYED ISSUING PERMIT WITHOUT FINAL ELECTRICAL REVIEW, DAVID ABUOBAID STILL NEEDS TO REVIEW ELECTRICAL **** CCK 9/16/24
Status: Issued
Project Name: BLDG ALT/AVIATOR HOTEL
Review Type: Electrical
Result: Correction
Result Date: 9/6/2024 12:11:00 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

Electrical Comments

 

Reviewed by: David Abuobaid                                                 Permit: C24-1989

Phone:  343-8333                                                                     Date: 9/27/2024

Fax:      249-7775                                                                     

Email:   AbuobaidDH@muni.org

Permit  Manager: Marcus Mclaughlin

Phone:  343-8279

Email:   marcus.mclaughlin@muni.org

Project: Aviator Hotel

       ____________________________________________________________________________________  
     REQUIREMENT OF ELECTRICAL SCOPE OF WORK:                                                                                                      

       Please provide 100% designed engineered drawing by a registered professional    

     electrical engineer of the State of Alaska. The design shall include, wiring method, home  

     run wiring with type, size of wires and conduits, over-current protection, panel schedules

     with connected and demand loads and one-line diagram     

 

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Building Safety Division

Electrical Comments

 

Reviewed by: David Abuobaid                                                 Permit: C24-19893

Phone:  343-8333                                                                     Date: 9/6/2024

Fax:      249-7775                                                                     

Email:   AbuobaidDH@muni.org

Permit  Manager: Marcus Mclaughlin

Phone:  343-8279

Email:   marcus.mclaughlin@muni.org

Project: Aviator Hotel

____________________________________________________________________________________  
REQUIREMENT OF ELECTRICAL SCOPE OF WORK:

The Work is being done under Phase II Renovation.

Please provide the electrical scope of work and include existing service load calculations, panel schedules with connected and demand loads, one-line diagram and accessibility to overcurrent protection so we can determine if work requires 100% designed engineered electrical drawing.

 

 

ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS