THE OUSTANDING AGREEMENT IS NOT ADDRESSED AND RESOLVED.
I ADDED ON THE EPLANS THE REQUESTED FROM THE DESIGN ENGINEER TO CHUGACH AND THE RESPONSE FROM CHUGACH ENGINEER WITH INSTRUCTION FOR THE DESIN ENGINEER.
---------------------------------------------------------------------------------------------------
(1) The correction comment is for the tampered recepts. APPROVED.
(2) The outstanding agreement is not addressed and resolved. CORRECTION
----------------------------------------------------------------------------------------------------------------
The electrical plans are reviewed and correction comments are on the e-plan sheet.
-------------------------------------------------------------------------
REQUIREMENT OF ELECTRICAL SCOPE OF WORK: