COMM T/I TO INCLUDE RENOVATION TO THE EXISTING EXCALATOR ENCLOSURE THAT CONNECTS THE PUBLIC PARKING GARAGE TO THE AIRPORT TERMINAL. TO INCLUDE REMOVING THE EXISTING STEEL AND GLASS ENCLOSURE AND CONSTRUCTING NEW AND /P/M/E - BWP
COVID-19 DISCOUNT 25% APPLIED
Reviewed by: Bergstrom, Leigh W.
Phone: 343-8326
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Bob Parker
Phone: 343-8391
Email: ParkerRW@muni.org
Project: ANCHORAGE INTERNATIONAL AIRPORT
Review Number: 471478
1) STATUS: 4/30/2020 Comments to be addressed. 6/14/2021 APPROVED.
2) The following comments based upon the 2012 International Building Code (IBC) must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC or any federal, state or local regulations. RESOLVED 6/14/2021.
3) T0.1 The currently adopted version of the National Electric Code (NEC) is 2017. RESOLVED PER RE-SUBMITTAL RECEIVED 6/11/2021.
4) T0.1 The 2012 INTERNATIONAL ENERGY CONSERVATION CODE is to be included in the list of applicable codes affecting this project. RESOLVED PER RE-SUBMITTAL RECEIVED 6/11/2021.
5) A2.2 Key Sheet Note #6 states: "NEW AL. CURTAIN WALL SYSTEM W/ 1" THERMAL GLAZING". Please specify the thermal "U" factor that will meet the requirements of IECC Table C402.3 plus local amendment. RESOLVED PER RE-SUBMITTAL RECEIVED 6/11/2021.
6) A6.1 & A4.1 Provide structural and seismic calculations plus fastening details for the suspended circular ceiling decorations to include the engineers stamp and signature, for structural review on a deferred submittal basis. RESOLVED PER RE-SUBMITTAL RECEIVED 6/11/2021.