Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: C21-1333
Permit Type: Commercial Building Permit - None BldgAlter
Address: 1700 HILLCREST DR Anchorage
Location:
Work Description:

DEMO & REPLACE HYDRONID, DOMESTIC WATER, GAS, AND FDC PIPING PLUS DEMO OR RELOCATION OF ABANDONED-IN-PLACE/EXISTING PLUMBING PIPING & ELECTRICAL CONDUIT IN UTILIDOR AREAS. ALSO INCLUDES DEMO & REPLACE OF SLAB ON METAL DECK WITH FINISHES AND REPAIR OF EXISTING FIREWALLS IN THE UTILIDOR - BWP

2 PHASE PLAN - SEE PHASING PLAN

***THIS PERMIT WAS INCORRECTLY CLOSED BEFORE THE PHASES WERE COMPLETE. A NEW PERMIT WILL BE ISSUED AND ROUTED TO THE SAME REVIEWERS WITHOUT ANY FEES*** - MDR 4/22/2022

Status: Closed
Project Name: WEST HIGH SCHOOL
Review Type: Plumbing
Result: Approved
Result Date: 4/29/2021 11:55:22 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:


Reviewed by: Bergstrom, Leigh W.

Phone: 343-8326

Fax: 249-7615

Email: BergstromLW@muni.org

Permit Manager: Bob Parker

Phone: 343-8391

Email: ParkerRW@muni.org

Project: WEST HIGH SCHOOL

Review Number: 468350


1) STATUS: 4/23/2021 Comments to be addressed.                  4/29/2021 APPROVED.


2) The following comments based upon the 2018 Uniform Plumbing Code must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Plumbing Code or any federal, state or local regulations.                     RESOLVED 4/29/2021.


3) M0.01 GENERAL NOTE I                     Clarify the use of PPL piping as a UPC approved material for domestic water installations.          RESOLVED PER RE-SUBMITTAL RECEIVED 4/29/2021.


4) M2.01 thru M2.04                                  There are multiple locations where new plastic piping will be penetrating fire walls in the utilidors. Provide details for "Through-penetration firestop systems" rated for up to 2-1/2" plastic pipe in accordance with IBC 714.4.1.2.                       RESOLVED PER RE-SUBMITTAL RECEIVED 4/29/2021.


5) When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised plumbing pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT.  (23.10.104.8.1)                       RESOLVED 4/29/2021.
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS