The electrical blanket provided is acceptable and the change order is approved.
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Electrical Comments
Reviewed by: David Abuobaid Permit #: C20-11166 (X21-1036)
Phone: 343-8333 Date: 2/2/2021
Fax: 249-7775
Email: AbuobaidDH@muni.org
Permit Manager: Bob Parker
Phone: 343-8391
Email: Parkerrw@muni.org
Project: ANC Airport Transfer Switch Replacement (Fax: no fax provided)
____________________________________________________________________________________ 1. The following comments based on the 2017 National Electrical Code (NEC) must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the NEC or any federal, state or local regulations.
2. CHANGE ORDER # X21-1036
Please provide the detail rating on non conductive curtain that is intended to be used to in front of new
277V line to ground transfer switch installation to change classification to condition 1 to meet current
code.
3. When the above comments have been addressed, please update the electrical plans at the MOA Plans
Review Office with three (3) sets of revised electrical pages to include clouded changes, electrical
engineers stamp and signature.