Permit Number: C20-1413
Permit Type: Commercial Building Permit - None BldgAlter
Address: 2801 DEBARR RD Anchorage
Location:
Work Description:

REMOVAL OF ROOF WATERPROOFING LAYER, INSULATION AND ROOF DRAINS.  INSTALL NEW ROOFING, INSULATION, ROOF DRAINS AND RAISE PARAPET WALLS - MJD

COVID-19 25% DISCOUNT APPLIED

Status: Issued
Project Name: ARH ROOF REPLACEMENT
Review Type: Structural
Result: Correction
Result Date: 6/26/2020 11:44:00 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

STRUCTURAL REVIEW COMMENTS

Permit #: C20-1413

Project: Alaska Regional Hospital – Roof Replacement

Date: June 26, 2020

____________________________________________________________________________________

STRUCTURAL REVIEW STATUS

6/4/20 – Initial review complete; revision and additional submittals are required.

6/26/20 – 2nd review complete; revision is required.


This review is based on the requirements of the Anchorage Municipal Code (AMC), 2012 International Building Code (IBC) and all adopted references thereto as amended by MOA. The following comments must be addressed before a permit can be issued. The approval of plans and specifications does not permit the violation of the codes, or any federal, state or local regulations.

1. Please provide the calculations package including wind uplift, roofing fastening and lateral requirements for roof-top mounted equipment.


Resolved.


2. Please provide a General Notes drawing sheet stating code design criteria and specifications for the divisions of work used in the project and Special Inspections required.


Resolved.


3. Drawing sheet S201 and S202: Please provide the details of roof framing and roofing attachment for unknow areas of the roof as a deferred submittal.


Resolved.


4. Detail 1/S400: Please specify a base plate thickness and fasteners for the new RTU support columns.


Resolved.


5. Detail 2/S400: It is uncertain what the leader specifying fastening at the base of RTU support is pointing to; please clarify.


Resolved.


6. Detail 3/S400: Please specify a plate thickness and fasteners at the guy wire attachment. Also, it is uncertain how the fasteners are to be tightened.


Unresolved; cap plate thickness and eye bolt not specified.


7. Detail 1/S401: Please specify the fasteners required at the new pipe column to existing RTU frame connection.


Resolved.


8. Please provide a letter of Special Inspection.


Resolved.


Please address each comment and include one copy of additional/revised calculations and two copies of additional/revised drawings. Please indicate the location of any additions or corrections in the response. All documents should be submitted to the permit manager as shown above.