REMOVAL OF ROOF WATERPROOFING LAYER, INSULATION AND ROOF DRAINS. INSTALL NEW ROOFING, INSULATION, ROOF DRAINS AND RAISE PARAPET WALLS - MJD
COVID-19 25% DISCOUNT APPLIED
Reviewed by: Bergstrom, Leigh W.
Phone: 343-8326
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Melissa Davidson
Phone: 343-8339
Email: DavidsonMJ@muni.org
Project: ARH ROOF REPLACEMENT
Review Number: 450095
1) STATUS: 5-19-2020 Comments to be addressed. 6-16-2020 APPROVED.
2) The following comments based upon the 2012 International Building Code (IBC) must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC or any federal, state or local regulations. RESOLVED 6-16-2020.
3) A002 The occupancy group for a hospital is "I-2". (IBC 308.4) RESOLVED PER RE-SUBMITTAL RECEIVED 6-08-2020.
4) A002 The building is at least 6 stories. "I-2" in a 6 story building requires Type "1A" construction. (IBC Table 503) RESOLVED PER RE-SUBMITTAL RECEIVED 6-08-2020.
5) A002 Type "1A" construction is not a 1 hour rated structure. Provide the Fire-Resistance Rating Requirements for Type "1A" Construction per IBC Table 601. RESOLVED PER RE-SUBMITTAL RECEIVED 6-08-2020.
6) A111 Sheet Note D9 (two locations) states: "Demolish existing door and frame." On sheet A201 for the new work, the replacement or fix is not addressed. Please clarify. RESOLVED PER RE-SUBMITTAL RECEIVED 6-08-2020.