A5.02, 1 and A5.06,5:A vertical grab bar is also required on the side wall of the ADA water closet. (ICC/ANSI A117.1-604.5.1). Verify that the vertical grab bar is now shown on the accessible Queen, accessible King, and Public toilet rooms.
NOT RESOLVED
RESOLVED
A4.0 thru A4.6; Show foundation insulation R-10 to at least 3 feet in depth.
MOSTLY RESOLVED: Foundation insulation, R-10 to at least 3 feet in depth, is now shown on most details. Note that the drawing numbers have changed. About 6 details still require insulation.
MOSTLY RESOLVED:The latest drawings are not provided yet in the plan set.
A0.01, Applicable Codes: The applicable codes and edition are as follows;
International Existing Building Code (IEBC) 2012 and local amendments
International Residential Code (IRC) 2012 and local amendments
International Fire Code (IFC) 2012 and local amendments
International Mechanical Code (IMC) 2012 and local amendments
International Fuel Gas Code (IFGC) 2012 and local amendments
International Energy Conservation Code (IECC) 2012 and local amendments
Uniform Plumbing Code (UPC) 2012 and local amendments
National Electric Code (ICC/NEC/NFPA 70) 2017 and local amendments
Accessible and Useable Buildings and Facilities (ICC/ANSI A117.1) 2009
MOSTLY RESOLVED: Please add the following that were missed.
A0.01, Several of the section/table reference numbers are applicable to the 2009 I codes. Please revise to cite the applicable 2012 edition.
RESOLVED.
A0.01, The required Building Element Ratings are correct as shown. Please clarify why some of the provided are less that required.
NOT RESOLVED:
This is now shown on G0.1; however, it still requires correction.
A0.01, Please address these additional items in the Code Study Items:
Add the public spaces occupant loads (Sec 1004)
Add Energy Code insulation requirements, including the foundation; reference; IECC Chapter 4 and local amendments)
Add the public spaces plumbing fixture count, i.e., required/provided; reference; Section 2902, Table 2902.1
Add the Guestroom Matrix the ADA count, i.e., required/provided; reference; Section 1107.6, Table 1107.6.1.1
A0.01, Means of egress: Add the common path of egress requirement; reference; Section 1014.3, Table 1014.3
The Construction Requirements identifies an A-5 occupancy; however, the Building Area Summary identifies an A-2 occupancy. Please clarify. Some areas actually appear to be an A-3 occupancy.
A2.05, Roof Plan; The two access hatches appear to be located within 10 feet of the roof edge. If so, indicate 42" high guards at the roof edge, reference Sec 1013
This is still not corrected. Please revise the roof hatch locations to greater than 10 feet of the roof edge or indicate 42" high guards at the roof edge.
STILL NOT RESOLVED:
This is still not corrected; the Alternate Means and Methods was not approved. Please revise the roof hatch locations to greater than 10 feet of the roof edge or indicate 42" high guards at the roof edge.
A1.01, Add a fire door at the east end of the residential corridor on the first floor, or continue the corridor 1/2 hour F R rating all the way out to the second exit.
NOT FULLY RESOLVED:
Check direction of door swings and continuity of the corridor 1/2 hour F R rating all the way out to the second exit.
Revise the door rating for Door 100B to 45 minutes; consider having it remain normally open on mag locks; closing on a fire alarm, sprinkler activation, loss of power, etc.
All drawings: The drawings still indicate 60% complete and F&F submittal. Please provide a full permit set of drawings.
MOSTLY RESOLVED:
Although the drawings indicate 60% complete and F&F submittal, the local Architect has informed me that in fact this is the full permit submittal set. This will be corrected on the next drawing submittal.
RESOLVED:
This has been corrected on all resubmitted drawings. The non revised drawings have been corrected in CAD; however, they have not been reprinted.
Drawing A2.05; Show the Make Up Air Unit on this drawing that currently exists on drawing M5.1 (RTU-3). The Make Up Air Unit appears to be located within 10 feet of the roof edge. If so, indicate 42" high guards at the roof edge, reference Sec 1013
Drawing A5.60; detail 5, Show the 18" vertical grab bar for the accessible QQ bathroom. Not that a similar compliant detail for the accessible king rooms should also be detailed.
Verify that the vertical grab bar is now shown on the accessible Queen, accessible King, and Public toilet rooms.
Drawing ID5.1, Employee Restroom elevation 14; Show the 18" vertical grab bar for the Employee Restroom. Ensure that compliant grab bars and other accessible requirements are also detailed for the public restrooms and the splash restroom.
Drawing A5.30, Detail 1 on Drawing A5.30 references Detail 1 on Drawing A4.06. This drawing was not provided in the plan set. Please check other references as well as this one.
Check all of the referenced details on the full plan set. Several are not accurate.
These drawings were not yet removed from the hard copy plan sets.
Please address each of the provided comments for a core and shell permit approval. The core and shell permit submittal will have further Architectural review prior to a final complete full Architectural review and approval.
Enough comments were resolved for core and shell permit approval. Resolve the remaining comments for full architectural approval
More than enough comments were resolved for core and shell permit approval. Resolve the remaining comments for full architectural approval.