Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: C20-1043
Permit Type: Commercial Building Permit - None BldgNew
Address: W 310 36TH AVE Anchorage
Location: ALOFT HOTEL, 146 ROOMS
Work Description: NEW CONSTRUCTION HOTEL (63,194 SQFT R-1 OCC. VA CONST.) (21,774 SQFT A-2 OCC. VA CONST).  TOTAL SQUARE FOOTAGE 84,968, 146 ROOMS - MJD
Status: Issued
Project Name: ALOFT HOTEL
Review Type: Plumbing
Result: Approved
Result Date: 4/6/2020 11:14:04 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:


Reviewed by: Bergstrom, Leigh W.

Phone: 343-8326

Fax: 249-7615

Email: BergstromLW@muni.org

Permit Manager: Melissa Davidson

Phone: 343-8339

Email: DavidsonMJ@muni.org

Project: ALOFT HOTEL

Review Number: 446503


1) STATUS: 3-09-2020 Comments to be addressed.                       3-25-2020 APPROVED FOR UNDERGROUND ONLY. CONTRACTOR TO PROCEED AT HIS OWN RISK.                             4-06-2020 APPROVED.


2) The following comments based upon the 2012 Uniform Plumbing Code must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Plumbing Code or any federal, state or local regulations.                 RESOLVED 4-06-2020.


3) M0.1                             Lavatories LV-1, LV-3 & LV-4 require an ASSE 1070 point of use mixing valve per UPC 421.2.                     RESOLVED PER RE-SUBMITTAL RECEIVED 4-03-2020.


4) M1.3 & M1.4                 Provide a reference to detail 8/M8.1 for a typical rain leader penetration through the floor.                      RESOLVED PER RE-SUBMITTAL RECEIVED 4-03-2020.


5) M1.3                             Would it be advantageous to provide a HWC line down to the pool area to service LV-3 and EW-1?               RESOLVED PER RE-SUBMITTAL RECEIVED 4-03-2020.


6) 3/M7.1 & M1.5              The 2" vent riser serving the bathroom group and janitor's closet at column line 6 appears to be undersized per UPC Table 703.2 and is only called as 1-1/2" per Keynote #1 on M1.5.               RESOLVED PER RE-SUBMITTAL RECEIVED 4-03-2020.


7) When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised mechanical pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT. (23.10.104.8.1)                          RESOLVED 4-06-2020.

ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS