Permit Number: C20-1046
Permit Type: Commercial Building Permit - None BldgAlter
Address: E 800 DIMOND BLVD Anchorage
Location:
Work Description: CINNABON INTERIOR T/I LOCATED IN SUITE 119 - MJD
Status: Closed
Project Name: CINNABON
Review Type: Plumbing
Result: Correction
Result Date: 2/24/2020 8:50:02 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:


Reviewed by: Bergstrom, Leigh W.

Phone: 343-8326

Fax: 249-7615

Email: BergstromLW@muni.org

Permit Manager: Melissa Davidson

Phone: 343-8339

Email: DavidsonMJ@muni.org

Project: CINNABON

Review Number: 444668


1) STATUS: 2-24-2020 Comments to be addressed.


2) The following comments based upon the 2012 Uniform Plumbing Codes must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Plumbing Code or any federal, state or local regulations. 


3) M-2                  The specified plastic piping (ABS, CPVC and PEX) may not be used in a return air plenum such as is the case on this project. (IMC 60602.2.1)


4) M-2                  Under the water heater sequence of operation, the specified unit is electric and does not have a "burner" to be regulated.


5) M-4                  The domestic water isometric drawing shown on detail 1/M-6 shows a reduced pressure backflow preventer which requires access between 12" and 5' AFF or provided with a permanent platform for installations over 5' (UPC 603.4.3). Please clarify the location on the floor plan.


6) M-6                  The waste riser diagram states to "Carry I.W. full size from ice maker to FSK with air gap" but the receiver is tagged as FD (floor drain). Please clarify.


7) 1/M-6               The hub drain at the three compartment sink requires venting per UPC 1014.1.1.


8) When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised plumbing pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT. (23.10.104.8.1)