Permit Number: F19-1218
Permit Type: Commercial Trade Permit - Alteration Fire
Address: 3101 PENLAND PKWY Anchorage
Location:
Work Description: 306 TOTAL DEVICES.  AE
Status: Closed
Project Name: NORTHWAY MALL
Review Type: Fire System
Result: Approved
Result Date: 12/23/2019 10:14:00 AM

Comments:

 Code SectionReview CommentStatus
1_Resolved
Permit is in the wrong contractors name currently in Yukon Fire Protections name, but they are only the design firm and programming firm.  Actual contractor is Northstar Fire Protection.  Change of Contractor form is required.  Go to http://www.muni.org/Departments/OCPD/development/BSD/Forms/contractortransfer.pdf to obtain the form.

2_Resolved
Sheet 1 Weather proof speaker strobe coverage is missing in rooms 111, 118, 139

3_Resolved
Sheet 1 SLC going from 2nd floor office to 1st floor is going to the wrong device address.   Clarify on the plans.

4_Resolved
Sheet 2 Hall next to A-08/Carrs is over 180 feet and requires a strobe in the middle of the hall.

5_Resolved
Sheet 2 Remove Elks Club fire alarm panel and related device.  Make part of the mall fire alarm system as be meeting agreement with Northstar Fire and Mall Owners.

6_Resolved
Sheet 2 Remove Old VA Space fire alarm panel and related device.  Make part of the mall fire alarm system as be meeting agreement with Northstar Fire and Mall Owners.  Note: VA horn strobes can remain until space is leased and then the space will required code compliant speaker strobe coverage....Bart Meinhardt AFD Fire Inspector.

7_Resolved
Sheet 2 - Remove pull station in the old VA space that are not required by code or change to addressable devices on the mall fire alarm system.

8_Resolved
Sheet 2 add speaker strobe in east service hall over 15 feet from door.

9_Resolved
Sheet 3 Provide notification in main entrance to mall.

10_Resolved
Sheet 3 - Fresh Look provide strobe cover in office and restroom.

11_Resolved
Sheet 3 - Mall storage M-07 add pull station missing at double doors on east wall.

12_Resolved
Sheet 4 add strobe coverage in suite E-4 Foot Locker by the dressing room and increase the 30 cd to 75cd on sales floor. 

13_Resolved
Sheet 4 suite F-2 take out of the scope of work for the project.

14_Resolved
Sheet 4 storage room behind G-8 increase strobe coverage to 30cd

15_Resolved
Sheet 5 remove G-29 and H-4 from scope of work with exception of installing the pull station in H-4

16_Resolved
Sheet 5 add notification to main entrance to mall

17_Resolved
Sheet 8 remove smoke detection from suite A-16 or make addressable on the mall system.

18_Resolved
Sheet 8 suite A-16 make pull station addressable on the mall system.

19_Resolved
All sheets:  Clearly identify next to each RTN which ones are out of service and decommissioned on each sheet of the plans.

20_Resolved
All sheets: Clearly identify all circuits by name when that leave one sheet and continue on to another sheet.  

21_Resolved
All sheets:  Clearly identify match lines on what pages match up.

22_Resolved
Cover Page: clearly state not in scope of work:  "Vacant tenant spaces will be upgraded to be code compliant when space is leased/occupied by tenant or for storage."

23_Resolved
Cover Page: clearly state not in scope of work:  "RTN units that are currently decommissioned or out of service will have code compliant duct detection installed when the unit is reactivated." 

24_Resolved
BPS panel battery calcs show required alarm 5 minutes but voice evac systems require 15 minutes.  Current appears correct, but verbiage is not correct on BPS1, 2, 3, 4, 5, 

25_Resolved
Nac circuit load calculations, NAC 3, 5, 6, 7, 9, 37, 38, 39, 45.  The device count listed on the sheet do not match the plans for quantity of devices and or the correct strobe setting.   NAC's 10, 11,  12, 13, 14, 15, 16, 17, 18,41, 42, 43, were not checked.

26_Resolved
NAC voltage drops, evac voltage drops, evac load calcs, BPS battery calcs have not been checked.

27_Resolved
Need to ensure that each circuit has 20 percent spare capacity to cover future ADA requirements 2012 IFC 907.5.2.3.2

28_Resolved
Need to verify that the fire alarm system has capacity to cover vacant tenant spaced for SLC, NAC and EVAC needs.  Show on plans expected loads in voltage drop, battery calcs for NACs and EVAC circuits; original plans when the mall system start to being installed showed these load, current plans do not show loads.


29_Resolved
Plan review stopped, plans are incomplete.  Meeting scheduled with Northstar Fire and Yukon Fire on 11/22/2019 at 10 am.

30AMC 23.10.104.9Deferral of any submitted items shall have the prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review.
Phasing Plan
Phase 1 - Mall core area
           Completion July 1, 2020
Phase 2 - Carrs
           Completion July 1, 2021
Phase 3 - JoAnn's
           Completion Dec 30, 2021

VA, Elks Club and Vacant Tenant to be compliant upon 
     lease build out or occupancy






Advisory Information: