Work Description: PAHRMACY RENOVATION AND EXPANSION. THE WORK INCLUDES NEW COMPOUNDING HOODS, NEW AIR HANDLING UNIT, RELOCATION OF STAFF RESTROOM AND BREAKROOM, AND NEW FINISHES AND LIGHTING - BWP
Status: Closed
Project Name: ARH PHARMACY RENOVATION
Review Type: Structural
Result: Correction
Result Date: 12/11/2019 9:28:00 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:

Structural Comments

 

Reviewed by: Hellman, Becky A.                                              Permit #: C19-1973

Phone: 343-8237                                                                                    Second Review     

Fax: 249-7400                                                                                 Date: 12-11-19

Email: hellmanba@muni.org

Permit Manager: Bob Parker

Phone: 343-8391

Email: Parkerrw@muni.org

Project: Alaska Hospital tract B3 – 2801 Debarr Rd – ARH Pharmacy Renovations

____________________________________________________________________________________

Plan review comments:

 

12-11-19  Calculations that were provided were reviewed; see the following comments below that came from the review of this project.

 

1.  This review is a code compliance review based on the requirements of the 2012 International Residential Code (IRC), 2012 International Building Code (IBC) and all adopted references thereto as amended by the Municipality of Anchorage in the Anchorage Municipal Code (AMC) Title 23.  This review does not permit the violation of the building codes, nor any federal, state, or municipal regulation.

 

2.  Please provide general notes for materials specs, welding, etc.

 

3.  Please verify if special inspections is required; please clarify what inspections are needed or not needed on the plan.  1705.2.2.1 and 23.15.1705.2.2.1

 

4.  See details 4 and 5; Please fix the welding symbols.  For the channel to beam weld and tube, the flare bevel weld wouldn’t have a thickness and the use of the “all around” mark would be correct.

The channel weld should be a fillet weld.

 

Address all comments above to complete the permit process.  Please provide corresponding letter that describes how comments have been addressed and where on the plans the changes have occurred.  Any additional information that is provided to address the above comments could result in additional comments based on the new information provided for review.   All submittals should be sent or given to the permit manager for this project.

 

 