EXTERIOR FINISH UPGRADES AND NEW CANOPY (REPLACE EXISTING CANOPY USING EXISTING FOUNDATION) - RED
TO INCLUDE ELECTRICAL
CONTRACTOR TO PAY FOR INSPECTIONS AT PERMIT ISSUE - RED
X19-1382 - CONFORMED SET (REMOVEL OF FACADE SCOPE W/ ASSOCIATED ELECTRICAL, TO BE SUBMITTED UNDER SEPERATE PERMIT C19-1546) - RED
Advisory Comment: Right of Way Permit required for all work in Municipal Rights of Way, Public Use, generic Utility, Storm Drainage, and some BLM Easements. Types of work include, but are not limited to water and sewer service connections, new driveways, drainage improvements and landscaping improvements. Only contractors with a current Right of Way Bond on file in the Right of Way Office may obtain a Right of Way Permit.
Provide or correct the Vicinity or Location Plan.
Show existing and proposed topography, including spot elevations near driveways, property corners, parking lots, and building corners.