Comm T/I to include P/M/E - BWP

(485) DEVICES

Status: Closed
Project Name: Child of Bldg C17-2028
Review Type: Fire System
Result: Correction
Result Date: 4/30/2019 1:11:00 PM

Comments:

 Code SectionReview CommentStatus
1_Transfer
Fire alarm drawings are not NFPA 72 compliant after quick counter review. Ian is sending them back for redesign.

2_Resolved
Show on Matrix:  Elevator recall primary, Elevator recall secondary, Red Hat activation, smoke detector at top of shaft to send elevator to the primary landing. Smoke detector in the machine room should send elevator to floor other than the level that the machine room is on. 

3_Resolved
Is there duct detection in the building?  If so show on plans and matrix 

4_Resolved
Is there fire smoke dampers in the building?   If so show on plans and matrix

5_Transfer
Show on plans ceiling heights as required by 2012 IBC section 907.1.2 #11. There are notes on the plans that indicate ceiling heights but there should be a cross section of each floor. 

6_Resolved
Room 128 needs strobe

Elevator lobby by room 322 needs strobe

2012 IBC 907.5.2.3.1


7_Resolved
Rooms 148, 150, 152 require 177 cd strobes per 2010 NFPA 72 section 18.5.4.6.2

8_Resolved
Stair 256 where does the door go on 2nd floor?  Outside to a drop to ground?

9_Resolved
Stair 300 and 356 required smoke detection per 2012 IBC 907.2.8.2

10_Resolved
Calcs do not show any amperage draw for door holders, show in calcs

11_Resolved
Calcs do not show the 177/110 cd strobes, show in calcs. The one lines do not reflect the calcs and the calcs are off and not the correct ones for the devices listed. 

12_Resolved
With voltage drop calculations starting at 20.4 volts and ending voltage of 16 volts as listed on the plans, the amperage listed for the devices are for 24 vdc.    Use UL max amperage or 16vdc amperage for device in calculations.

Starting Voltage of 20.4 dc required per 2010 NFPA 72 section 10.14.1



13_Resolved
Dedicated Branch Circuit required per the 2010 NFPA 72 section 10.5.5.1 for 120 VAC to panels, show on plans.



14_Resolved
What gas detection is in the hotel?

Reference Flag note 1  on FA1.1


15_Resolved
Show on plans for dry sprinkler system monitoring of the sprinkler tamper, water alarm , low air.

Show on Matrix sprinkler operation

Reference Flag note 2  on FA1.1


16_Resolved
Update wiring for initiating devices to 16/2 for what the electrical contractor is installing

17_Resolved
Room 138, provide smoke detection over fire alarm panels 2012 IBC 907.4.1

18_Resolved
Show on matrix operation of the elevator damper.

19_Resolved
Plan review stopped, provide code compliant plans in accordance with the 2012 IBC, 2010 NFPA 72 and MOA ammendments. There are still items to be addressed however this is a complete list. 

20_
Low frequency sounder bases have the wrong calcs. Calcs should start at 16 VDC. 

21_Resolved
A pull station will be required at the electric room 122. 

22_Resolved
Show a smoke or heat detector at the annunciator in the entry. 