7/16/2019
The electrical scope of work is to add one circuit 120V, 20 amp, 1ph to the panel. Approved
---------------------------------------------
Electrical Comments
Reviewed by: David Abuobaid Permit #: C19-1214
Phone: 343-8333 Date: 3/11/2019
Fax : 249-7775
Email: AbuobaidDH@muni.org
Permit Manager: Richard Dienes-Oehm
Phone: 343-8034
Email: DienesOehmRE@muni.org
Project: ANCB Fuel Tank (Fax: no fax provided)
____________________________________________________________________________________ REQUIREMENT OF ELECTRICAL SCOPE OF WORK:I have reviewed the scope of work in the architectural plans.
Please provide the electrical scope of work and include classified locations, wiring method, existing service load calculations, panel schedules with connected and demand loads, one-line diagram, and accessibility to 0ercurrent protection so we can determine if work requires 100% designed engineered drawing by a registered professional electrical engineer of the State of Alaska.