STRUCTURAL DEMOLITION OF AVTEC MYSTIFIER SYSTEM AND REUSE ELECTRICAL CONTROL SCHEME - RED
TO INCLUDE PLUMBING (PART OF DEMOLITION WORK TO CAP PLUMBING SYSTEM FOR AVTEC SYSTEM, REQ'S INSPECTION)
TO INCLUDE ELECTRICAL (CONTROL SYSTEM MODIFICATIONS)