Permit Number: F18-1108
Permit Type: Commercial Trade Permit - New Fire
Address: 1076 OCEAN DOCK RD Anchorage
Location:
Work Description: OTHER FIRE SYSTEM - AFFF SYSTEM PRESSURE TEST (4 HOURS) - RED
Status: Issued
Project Name: CHILD OF C17-1642
Review Type: Fire System
Result: Approved
Result Date: 10/12/2018 12:15:00 PM

Comments:

 Code SectionReview CommentStatus
1_Resolved
Plans were submitted after the installation for the modifications to the foam system piping without a detailed analysis of the changes per 2010 NFPA 11 section 8.3.2

2_Resolved
Provide hydraulic calculations for each tank served by each dedicated line per 2010 NFPA 11 section 8.3.4 (7)....8/24/2018 Provide hydraulic calculation for each tank as the piping for the fire protection varies in length and diameter from the large tank utilizing 8 inch piping supply were as the other tanks utilize 6" and 4" supply piping.

3_Resolved
Provide required amount of foam solution application to be delivered to each foam chamber per 2010 NFPA 11 section 8.3.4 (3).....8/24/2018 rate will be 0.1 gpm/ft2

4_Resolved
What type and brand of foam is being used and at what concentration per 2010 NFPA 11 section 8.3.4 (2)......8/24/2018 National Foam Aer-O-lite

5_Resolved
What brand and model are the foam chambers?.......8/24/2014 National Foam

6_Resolved
Provide Submergence volume Calculations

7_Resolved
Meet all applicable requirements of Chapter 8 of the 2010 NFPA 11 as the length of piping on each foam system has increase

Tank 4236 estimated pipe length: New arrangement 764 feet, Old arrangement 304 feet
Tank 4215 estimated pipe length: New arrangement 503 feet, Old arrangement 426 feet
Tank 4217 estimated pipe length: New arrangement 395 feet, Old arrangement 265 feet
Tank 4216 estimated pipe length: New arrangement 477 feet, Old arrangement 364 feet


8_Resolved
Per 2010 NFPA 11 section 5.2.5.1.2.1 each foam discharge outlet requires a separate valve for isolation outside the dike area in accordance with 9.5.1.

9.5 Valves in Low-Expansion Systems. 9.5.1 The laterals to each foam discharge outlet on fixed roof tanks shall be separately valved outside the dike in the following circumstances: (1) All fixed systems (2) Any laterals of a semi-fixed system not supplied by an individual hose connection 9.5.1.1 Valves shall be located either in the central foam station or at points where the laterals branch from the common supply line. 9.5.1.2 These valves shall not be located within the dike. 9.5.1.3 Valves shall be located at a distance of at least one tank diameter from the tank but in no case less than 15 m (50 ft). 9.5.1.4 Shutoff valves shall be permitted to be located at shorter distances where remotely operated, subject to the approval of the AHJ. ......8/24/2018 tanks are fixed cone with internal floating roofs.



9_Resolved
Per 2010 NFPA 11 section 9.6.1 Where protecting hazards where there is a possibility of explosion, pipework shall be routed to afford the best protection against damage. Lines by fuel pump rack were all 4 lines run by outside the dike.

10_Resolved
Per 2010 NFPA 11 section 9.6.2 the supply piping to foam outlets that protect a given hazard in a fire area shall not pass over another hazard in the same fire area. (example: fuel lines, fuel pumps).....8/24/2018 Per Fire Marshal Cleo Hill, Coffman Engineers and Andeavor will have to come up with and alternate to protect the piping.

11_Resolved
Provide a code compliant design meeting the requirements of the 2010 NFPA 11

12_Resolved
Fire protection piping on plans, does not match what is being installed.

13_Resolved
Provide a designer that can prove relevant experience with foam fire protection system.....8/24/2018 Jason Anderson with Coffman Engineers is taking responsibility.

14_Resolved
Provide plans and calculations in complaiance with the 2010 NFPA 13 and NFPA 11 requirements

15_Resolved
Work started without a F Permit reviewed and approved for the fire foam system, Notice of Permit Required (NOPR) to be issued to Coffman Engineers, Udelhoven and Andeavor for working without a permit....8/24/2018 letter dated 7/12/2018 from Coffman Engineers acknowledging working without a permit on the fire system. Note: Original temporary piping was put in 2007 by Udelhoven without a permit per Nelson Alger.

16_Resolved
Plan review stopped, provide plans in compliance with adopted codes