Correction, MG 9-20-18.
1. Drainage Report: If applicable complete the DrainageCertification found in the Drainage Design Guidelines Appendix C-3 (Pleasedo not confuse size of project with size of lot) , along with backup calculations (areas andweighted coefficients) stamped by a civil Engineer (http://www.muni.org/Departments/works/project_management/Pages/Publications.aspx).Otherwise, Provide a drainage report prepared, signed and stamped by a civilengineer licensed in the State of Alaska per the 2007 DCM Ch:2. Referencethe 2007 Drainage Design Guidelines, Appendix A for preparation of a DrainageReport (follow the outline beginning on page A-3 and include relevant forms) tobe submitted with the drainage and grading plan. Please provide drainagecalculation inputs and results from modeling on a CD upon request (EPA SWMMdigital format or equivalent as applicable). Resolved with form C-3, MG 10-4-18.
2. Ref. C3.0, Proposed connection to 60” pipe; A manhole shall be installed at major junctions places where there arechanges in vertical or horizontal alignment, and at locations where there arechanges in pipe size or shape. 2007 DCM 2.7.D.1. Resolved per email fromPaul VanLandingham dated 9-25-18, MG 10-4-18.
3. Ref. C3.0, Proposed connection to 60” pipe; Two 12” dia. pipe inverts are shownand only one 60” pipe invert. This appears to be an error.
4. Indicate the installation of storm drain pipe locator tape three feet belowfinish grade or two feet deep in the street structural section. MASS Section20.13 Article 13.3.E, page 39 R2. Resolved, MG 10-4-18.