Permit Number: M18-1468
Permit Type: Commercial Trade Permit - New Mechanical
Address: 2801 DEBARR RD Anchorage
Location:
Work Description: REMOVE AND REPLACE (X2) CHILLERS, (X2) COOLING TOWERS AND NECESSARY PIPING - RED
Status: Closed
Project Name: ALASKA REGIONAL HOSPITAL - CHILLER REPLACEMENT
Review Type: Mechanical
Result: Approved
Result Date: 6/28/2018 1:25:00 PM

Comments:

 Code SectionReview CommentStatus



Advisory Information:


Reviewed by: Bergstrom, Leigh W.

Phone: 343-8326

Fax: 249-7615

Email: BergstromLW@muni.org

Permit Manager: Richard-Dienes-Oehm

Phone: 343-8034

Email: Dienes-OehmRE@muni.org

Project: ALASKA REGIONAL HOSPITAL

Review Number: 412235


1) STATUS: 6-01-2018 Comments to be addressed.                     6-28-2018 APPROVED.


2) The following comments based upon the 2012 International Building, Mechanical and Fuel Gas Codes must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC, IMC, IFGC or any federal, state or local regulations.                  RESOLVED 6-28-2018.


3) Provide structural and seismic calculations plus fastening details for CH-1 & 2, CT-1 & 2, CWP-1 & 2, 8" Spirotherm Air Separator, PCHP-1 & 2 and the Relocated Water storage Tank to include the engineers stamp and signature. Since the majority of the mechanical work also requires structural approval, the mechanical will not be approved until structural approval has been obtained.         RESOLVED 6-28-2018.


4) M3.01                   Clarify the demolition location for the "New Opening in Existing CMU Wall at the Chiller Room" with reference to the detail shown on S2.                           RESOLVED PER RE-SUBMITTAL RECEIVED 6-27-2018.


5) M3.02                   Provide a detailed centerline section through the 8" Emergency CWS pipe up into the EF-CH1 enclosure to include penetration of the concrete pad and below grade 6" CMU exterior wall.                     RESOLVED PER RE-SUBMITTAL RECEIVED 6-27-2018.


6) M3.02                   Provide architectural details for the EF-CH1 concrete pad, 8" curb, underground duct enclosure and duct penetration of the 6" CMU below grade exterior wall.                RESOLVED PER RE-SUBMITTAL RECEIVED 6-27-2018.


7) M3.02                   Clarify the makeup air path for the chiller room when EF-CH1 is in operation.                   RESOLVED PER RE-SUBMITTAL RECEIVED 6-27-2018.


8) When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised mechanical pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT.   (23.10.104.8.1)                   RESOLVED 6-28-2018.