Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To Go Back To Permit Information

Permit Number: M18-1542
Permit Type: Commercial Trade Permit - Alteration Mechanical
Address: 6300 BOEING AVE Anchorage
Location:
Work Description: RTU & SPLIT UNITS MECH UPGRADE - RED
Status: Issued
Project Name: ALASKA CARGO PORT
Review Type: Structural
Result: Correction
Result Date: 7/11/2018 11:36:00 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:



Structural Comments



 



Reviewed by: Hellman, Becky A.                                 Permit #: C18-1686 for M18-1542



Phone: 343-8237                                                                        First Review



Fax: 249-7400                                                                   
Date: 7-11-18



Email: hellmanba@muni.org



Permit Manager: Dienes-Oehm,
Richard



Phone: 343-8034



Email: Dienes-OehmRE@muni.org



Project: Anchorage
International Airport – 6300 Boeing Ave. – Alaska Cargo Port



____________________________________________________________________________________



Plan review
comments:



 



1.  This review is a
code compliance review based on the requirements of the 2012 International
Building Code (IBC) and all adopted references thereto as amended by the
Municipality of Anchorage in the Anchorage Municipal Code (AMC) Title 23.  This review does not permit the violation of
the building codes, nor any federal, state, or municipal regulation.



 



2.  There is no information on the existing unit
provided.  The original curb attachment
to the building, that the new mechanical unit is attaching too, and the structural
support elements would be in question if the original unit is more than 10% of
the weight or the height.  Please provide
the weight and height of the original unit to show that the new unit is less of
not more than 10% increase in both cases. IEBC 40402.3, 402.4



 



3.  The engineering letter indicated that the new
unit will be fastened to the original curb, but the plan set states that the
new unit will be fastened to a new adapter curb. 



What is the height
of the adapter curb?  An increased height
will increase the wind load, which may decrease the fastening spacing due to
increased load.  Please confirm the
adapter curb height will not change the attachment of the unit as specified; and
confirm that the unit attachment specified is the same for both the unit to the
adapter curb and the adaptor curb to the existing curb.



 



Address all comments above to complete the permit process.  Please provide corresponding letter that
describes how comments have been addressed and where on the plans the changes
have occurred.  Any additional
information that is provided to address the above comments could result in
additional comments based on the new information provided for review.   All
submittals should be sent or given to the permit manager of this project.