Electrical Comments
Reviewed by: David Abuobaid Permit #: C18-1657
Phone: 343-8333 Date: 6/13/2018
Fax: 249-7775
Email: AbuobaidDH@muni.org
Permit Manager: Andrew Earp
Phone: 343-8338
Email: EarpAL@muni.org
Project: Alsco Aviation (Fax: no fax provided)
____________________________________________________________________________________
REQUIREMENT OF ELECTRICAL WORK: Please provide 100% designed engineered drawing by a registered professional electrical engineer of the State of Alaska. The design shall include existing service load calculations, panel schedules with connected and demand loads, home run wiring with size of wires and conduit and one-line diagram. Refer to the attached handout No.E0.1 for Engineering Requirements
-----------------------------------------------------------------------------------------------------------------------------
The engineered drawing by a registered professional electrical engineer of the State of Alaska were initially provided, and possible not seen in the plan set when first reviewed. The provided stamped drawings are considered to be electrically code compliant for the new replacement gate C-8 jet bridge. D E Crafts 6/15/18
ADVISORY COMMENT:
Ensure that the new gate C-8 jet bridge assembly has a third party listing; or a field evaluation would be required. D E Crafts 6/15/18 ------------------------------------------------------------------------------------------------