REMOVE AND REPLACE (X2) CHILLERS, (X2) COOLING TOWERS AND NECESSARY PIPING - RED
PER X18-1837, THERE NEEDS TO BE A FRAMING INSPECTION FOR THE ENCLOSURE OF EXHAUST FAN/CHILLED WATER PIPE CONNECTIONS.
Structural Comments
Reviewed by: Hellman, Becky A. Permit #: C18-1611 for M18-1468
Phone: 343-8237 First Review
Fax: 249-7400 Date: 6-15-18
Email: hellmanba@muni.org
Permit Manager: Dienes-Oehm,Richard
Phone: 343-8034
Email: Dienes-OehmRE@muni.org
Project: AlaskaHospital Lot 1 B Tract B3 -
____________________________________________________________________________________
Plan reviewcomments:
1. This review is acode compliance review based on the requirements of the 2012 InternationalBuilding Code (IBC) and all adopted references thereto as amended by the Municipalityof Anchorage in the Anchorage Municipal Code (AMC) Title 23. This review does not permit the violation ofthe building codes, nor any federal, state, or municipal regulation.
2. No calculations were provided for review;please provide them for the following items.
A. The new opening in the CMU wall.
1. The design of the steel beams; I’m assuming that the twodrawings are showing options.
2. Please provide a design for the steel beam options for the newheader supporting the load above. Pleaseclarify by showing what load above there is to be supported.
3. Please make it clear in thedrawing that there is vertical reinforcement on the edge of the new opening,within 16” of the edge of opening. Orprovide a solution for this, if there isn’t vertical reinforcement.
4. Show on the plan wherethis new opening will be located.
ACI 530-
B. New equipment:
1. When old equipment is being replace, and the plan stated that the old isthe same as the new; there needs to be more information provided to show thatthe old is indeed the same as the new. Please provide weight and physical size of old equipment compared to thephysical size and weight of the new. Weneed to verify that both are not increased by more than 10% that the IEBCallows.
2. Attachment of the new equipment over 400 pounds needs to be designedbased on the ASCE 7-10 Chapter 13. Providethis design for review and details on the plan for the installation of allequipment to be installed. To followmanufactures installation doesn’t not mean that it was designed for our seismicand wind speeds.
3. Seeing as this is a risk category building IV, please read 13.1.3 andapply the Ip appropriately in design. Ifthis equipment needs to stay operational in/after an event, please very thatsection 13.2.2 is complied with on all equipment that is required to meet thisneed
C. Specialinspections.
1. Are any required per chapter17? Welding, bolting, concrete, etc. See section 23.15.1705.2.2.1 and23.15.1705.18 for exceptions to the code as to why special inspection may notbe needed, otherwise they may be needed.
Please determinespecial inspection requirements and place on the plans all required specialinspections
Address all comments above to complete the permit process. Please provide corresponding letter thatdescribes how comments have been addressed and where on the plans the changeshave occurred. Any additionalinformation that is provided to address the above comments could result inadditional comments based on the new information provided for review. Allsubmittals should be sent or given to the permit manager of this project.