REMOVE NON-BEARING OFFICE WALLS. (SEE DRAWINGS) STRUCTURAL IN AREA 1; ELECTRICAL IN AREA 1. AREA 2 IS THE BAGGAGE AREA AND WILL NOT HAVE INSPECTIONS.