Permit Number: C17-1670
Permit Type: Commercial Building Permit - None BldgAlter
Address: 1717 TIDEWATER RD Anchorage
Location:
Work Description: CONSTRUCT TRUCK INSPECTION PORTALS, INCLUDING NEW HYDRONIC HEATED CONCRETE PADS THE BOILERS, REQ ELECTRICAL, FIBEROPTIC CABLEING FOR DATA TRANSMISSION.  AE
Status: Closed
Project Name: GATE TECHNOLOGY PROJECT- PORT OF ANCHORAGE
Review Type: Mechanical
Result: Approved
Result Date: 8/23/2017 11:59:00 AM

Comments:

 Code SectionReview CommentStatus



Advisory Information:



Reviewed by: Bergstrom, Leigh W.

Phone: 343-8326

Fax: 249-7615

Email: BergstromLW@muni.org

Permit Manager: Andrew Earp

Phone: 343-8338

Email: Earpal@muni.org

Project: GATE TECHNOLOGY PROJECT-PORT OF ANCHORAGE

Review Number: 396697


1) STATUS: 7-12-2017 Comments to be addressed.             8-01-2017 COMMENTS TO BE ADDRESSED.                     8-23-2017 COMMENTS TO BE ADDRESSED.                   10-13-2017 APPROVED.


2) The following comments based upon the 2012 International Building, Mechanical and Fuel Gas Codes must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC, IMC, IFGC or any federal, state or local regulations.             RESOLVED 8-01-2017.


3) M2.1 thru M2.3                   Provide details for the GS & GR to the manifolds. (Pipe material, utilidor or buried, how deep, pipe insulation?)                7-01-2017 UNRESOLVED. THE RESPONSE INFORMATION MUST BE ADDED WITHIN THE PLAN SET.             RESOLVED 10-13-2017.


4) M2.4                                   Boilers shall be mounted on floors of non-combustible construction, unless listed for mounting on combustible flooring (IMC 1004.5). Please clarify.            RESOLVED PER RE-SUBMITTAL RECEIVED 7-27-2017.


5) M4.0                                   A note requires the boiler condensate to a drywell drain (see civil). The civil drawings did not appear to have any drywell information. Please clarify.            8-01-2017 UNRESOLVED. THERE ARE NO REVISED CIVIL DRAWINGS WITHIN THE PLAN SET.           8-23-2017 THIS COMMENT DEFERRED TO ITEM #10 BELOW.


6) M4.0                                   Provide details for the condensate pipe routing to the drywells and the required freeze protection per UPC 3312.6.                     RESOLVED PER RE-SUBMITTAL RECEIVED 7-27-2017.                8-23-2017 THIS COMMENT DEFERRED TO ITEM #10 BELOW.


7) M4.1                                   Provide manifold piping details to include access and weather protection.                  RESOLVED PER RE-SUBMITTAL RECEIVED 7-27-2017.


8) M4.1                                   Provide snowmelt piping information for each area such as pipe size, tubing lengths, spacing, number of loops, GPM, pressure drops, etc.               RESOLVED PER RE-SUBMITTAL RECEIVED 7-27-2017.


9) M4.1                                   Provide tubing manufacturer's details showing recommended insulation, fastening to cement reinforcing material and control joint (CJ) passage.             RESOLVED PER RE-SUBMITTAL RECEIVED 7-27-2017.


10) 8-23-2017                        Due to the unusual nature of this project, the engineering services manager and the chief plumbing and mechanical inspector have made the following determinations. The use of a drywell will not be permitted, a floor drain will not be required or permitted and the boilers allowed shall be non-condensing. Additionally, provisions shall be made and expressed on the plans to allow drain down and capture of the boiler fluid to allow for servicing or repairs. Please revise the plans accordingly.              RESOLVED PER ALTERNATE MEANS AND METHODS REQUEST UNDER C/O #X17-1912 APPROVED ON 10-13-2017.


11) When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised mechanical pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT.   (23.10.104.8.1)               RESOLVED 10-13-2017.