Reviewed by: Bergstrom, Leigh W.
Phone: 343-8326
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Andrew Earp
Phone: 343-8338
Email: Earpal@muni.org
Project: GATE TECHNOLOGY PROJECT-PORT OF ANCHORAGE
Review Number: 393635
1) STATUS: 7-12-2017 Comments to be addressed.
2) The following comments based upon the 2012 Uniform Plumbing Code must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the Uniform Plumbing Code or any federal, state or local regulations.
3) M2.4 Boiler rooms are required to have floor drains per IMC 1004.6.
4) M2.4 The floor drains shall be trapped and vented and connected to existing sanitary sewers within 200 feet per UPC 713.4. (Ref sheet C1.1)
5)1/M4.1 Where is the source of the CW makeup?
6) When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised plumbing pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT. (23.10.104.8.1)