Reviewed by: Bergstrom, Leigh W.
Phone: 343-8326
Fax: 249-7615
Email: BergstromLW@muni.org
Permit Manager: Andrew Earp
Phone: 343-8338
Email: Earpal@muni.org
Project: GATE TECHNOLOGY PROJECT-PORT OF ANCHORAGE
Review Number: 393634
1) STATUS: 7-12-2017 Comments to be addressed.
2) The following comments based upon the 2012 International Building, Mechanical and Fuel Gas Codes must be resolved before a permit is issued. The approval of plans and specifications does not permit the violation of any section of the IBC, IMC, IFGC or any federal, state or local regulations.
3) M2.1 thru M2.3 Provide details for the GS & GR to the manifolds. (Pipe material, utilidor or buried, how deep, pipe insulation?)
4) M2.4 Boilers shall be mounted on floors of non-combustible construction, unless listed for mounting on combustible flooring (IMC 1004.5). Please clarify.
5) M4.0 A note requires the boiler condensate to a drywell drain (see civil). The civil drawings did not appear to have any drywell information. Please clarify.
6) M4.0 Provide details for the condensate pipe routing to the drywells and the required freeze protection per UPC 3312.6.
7) M4.1 Provide manifold piping details to include access and weather protection.
8) M4.1 Provide snowmelt piping information for each area such as pipe size, tubing lengths, spacing, number of loops, GPM, pressure drops, etc.
9) M4.1 Provide tubing manufacturer's details showing recommended insulation, fastening to cement reinforcing material and control joint (CJ) passage.
10) When the above comments have been addressed, please update the plans at the MOA Plans Review Office with three sets of revised mechanical pages to include clouded changes, engineers stamp and signature. RE-SUBMITTALS ARE TO BE DIRECTED TO THE ATTENTION OF THE PERMIT MANAGER WITH A LETTER OF RESPONSE ADDRESSING EACH COMMENT. (23.10.104.8.1)