RE-ROOF: REMOVE AND REPLACE EXISTING ROOFING ASSEMBLY. REPLACE EXISITNG ROOF DRAINS, NEW PARAPET WALLS. (BUILDING 2) UPGRADE EXISTING UNIT HEATERS. AE
****FOLDER CREATED PLANS INSIDE****
Structural Comments
Reviewed by: Hellman, Becky A. Permit#: C17-1576
Phone: 343-8237 First Review
Fax: 249-7400 Date: 7-18-17
Email: hellmanba@muni.org
Permit Manager: Earp,Andrew
Phone: 343-8338
Email: EarpAL@muni.org
Project: AnchorageInternational Airport -4150 Aircraft – State of Alaska – Warm Storage BLDG 1
____________________________________________________________________________________
Plan reviewcomments:
1. This review is acode compliance review based on the requirements of the 2012 InternationalBuilding Code (IBC) and all adopted references thereto as amended by theMunicipality of Anchorage in the Anchorage Municipal Code (AMC) Title 23. This review does not permit the violation ofthe building codes, nor any federal, state, or municipal regulation.
2. Please provide afull set of plans, the writing is required to be a minimum of 3/32” for thefield set per policy AG 39.
3. See the codes andstandards. Sheet G1. The MOA iscurrently under the 2012 codes and were under this version of the code when theplans were stamped; please update the code referenced for this project to meetthe current version of adopted codes.
4. Engineer of record is responsible for theattachment of the parapet as seen on sheet A1 and A2; since he is responsible forthe details that references his design, the pages shall be stamped.
Also, in the details(3, 4, 5, and 7) that are on sheet A2 that shows added parapets, will theattachment of the parapet be the same as detail 6, if so, please state typicalfor all details to follow this attachment.
5. See the plan on sheet A1. Around the raised framing are referenceddetails that are on sheet A2, but A1 is noted, please revise reference.
6. See the details on sheet S3. Per the NDS 10.1.4; methods of analysis andtest data for establishing reference design values for connections made withmore than one type of fasteners have not been developed. Referenced design values and design valuesadjustments for mixed fastener connections shall be based on tests or otheranalysis. Please revise the design of theseadded connection to consider equal type fasteners for load sharing per thiscode section.
Address all comments above to complete the permit process. Please provide corresponding letter thatdescribes how comments have been addressed and where on the plans the changeshave occurred. Any additionalinformation that is provided to address the above comments could result inadditional comments based on the new information provided for review. Allsubmittals should be sent or given to the permit manager of this project.