MISCELLANEOUS REVISIONS ARCH. REV'S 4 AND 5 STRUCT REV 8 AND 9; MECH REV'S 4 AND 5; ELEC REV 3,4,5,6
PLANS ARE ROLLED AND TAGGED SEPERATELY AE
Permit: C16-1933
X17-1410
Date: 6-8-2017
Reviewed by: Ron Wilde
Phone: 343-8371
Fax: 343-8200
Email: wilderg@muni.org
Project: ElevatorRail and Attachments
Dave and Buster’s
1. PERMIT STATUS
6-8-2017 – Change order reviewed. Comments issued.
2. Advisory Comment (no response required): This review is based on the requirements ofthe 2012 Anchorage Administrative Code (AMC 23.10), 2012 International BuildingCode (IBC), and all adopted references thereto as amended by MOA. The following comments must be addressedbefore a permit can be issued. The approval of plans and specifications doesnot permit the violation of the codes, or any federal, state, or localregulations.
Please submit awritten explanation for how each comment has been addressed.
3. EXISING 2nd FLOOR BEAM REVISIONNEAR STAIR?
A part of this change order seems to be about moving a stairwestward so it will be closer to the elevator pit. And yet, existing 2nd floor beamsseem to have been removed with resulting changes in distance between existingbeams. Please explain. Is there something I am missing?
4. ELEVATOR RAIL AND ATTACHMENTS
I saw no calculations for the elevator rail and its attachmentsto support the new details. Pleaseprovide calculations showing complete code-compliant load paths for gravity andseismic restraint of elevator design loads.