Reviewed by: Hellman, Becky A. Permit #: X17-1099 for C15-1806
Phone: 343-8237 Second Review
Fax: 249-7400 Date: 3-6-17
Email: hellmanba@muni.org
Permit Manager: Bob Parker
Phone: 343-8391
Email: Parkerrw@muni.org
Project: Haxby-Afognak C Street LLC- Courtyard by Marriott change order
____________________________________________________________________________________
Plan reviewcomments:
1. This review is acode compliance review based on the requirements of the 2012 InternationalBuilding Code (IBC) and all adopted references thereto as amended by theMunicipality of Anchorage in the Anchorage Municipal Code (AMC) Title 23. This review does not permit the violation ofthe building codes, nor any federal, state, or municipal regulation.
2. 3-6-17 Resolved.
3. See sheet S101a;
a. Sheet shear wall10a;it appears that there is a holdown missing on one end of this panel. Also, the calculations show an HDU8, when theplan shows an HDU5
b. See shear wall 10bc;the holdowns in the calculation show that an HDU8 is to be used, the plan showsHDU5’s, please clarify change.
c. See shear wall 10F;this shear wall doesn’t have a holdown at the end towards the bottom of theplan, please provide overturning resistance at this end.
d. See changes forshear pier 13a; the calculations show that HDU11’s are required at the ends ofthis pier, there is an HDU2 shown on one of the ends, please clarify the use ofthis holdown or change to the HDU11.
e. See shear wallC13.5; on the plan sheet, the nailing information is not shown on the actualwall, there is two callouts on the wall to the right, please move the call outover to this smaller pier.
4. See detail 5/S502; pleaseprovide the justification of the insulation as shown; it doesn’t appear to meetthe requirements of the ASCE 32 or the soils engineer’s recommendations.
5. See the new sheet S111a; ahatch pattern was applied to the plan for the higher diaphragm blocking, withthis hatching, the writing under for some holdowns and column call outs are nolonger readable due to the hatching coving parts of the information. Maybe the hatching can be under the word forthe other information.
6. Detail 11/S501 now has theconnection to the steel for the shear walls at 16” o.c.; please providesupporting calculations for this change; nothing was provided that I couldfind.
Address all comments above to complete the permit process. Please provide corresponding letter thatdescribes how comments have been addressed and where on the plans the changeshave occurred. Any additional informationthat is provided to address the above comments could result in additionalcomments based on the new information provided for review. Allsubmittals should be sent or given to the permit manager for this project.